Lenovo ThinkSystem NE10032O RackSwitch Installation Manual page 53

For network operating system
Table of Contents

Advertisement

1. Select an empty power supply module bay on the rear of the switch. If the target 
bay is protected by a blank power filler plate, remove the blank.
2. Insert the power supply module into the selected power‐supply bay and gently 
push it into the slot until it latches. Each power supply module has a mechanical 
guide key to prevent you from inserting the module incorrectly.  
3. Connect the power cord to the power supply module and to an appropriate 
universal grounded AC power source.
4. Make sure that the power supply module's LEDs are green.
© Copyright Lenovo 2018
To Connect:
1.Turn OFF all power sources and 
equipment that is to be attached to 
this product.
2.Attach signal cables to the 
product.
3.Attach power cords to the 
product.
For ac systems, use appliance 
inlets.
For dc systems, ensure correct 
polarity of ‐48 V dc connections: 
RTN is + and ‐48 V dc is ‐. Earth 
ground should use a two‐hole 
lug for safety.
4.Attach signal cables to other 
devices.
5.Connect power cords to their 
sources.
6.Turn ON all the power sources.
To replace a hot‐swap power supply module, complete the following steps:
To Disconnect:
1.Turn OFF all power sources and 
equipment that is to be attached to 
this product.
For ac systems, remove all power 
cords from the chassis power 
receptacles or interrupt power at 
the ac power distribution unit.
For dc systems, disconnect dc 
power sources at the breaker 
panel or by turning off the power 
source. Then, remove the dc 
cables.
2.Remove the signal cables from 
the connectors.
3.Remove all cables from the 
devices.
Chapter 4: Removing and Replacing Components
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinksystem ne10032o

Table of Contents