Set-Up And Installation; Dimensions And Connection Dimensions; Different Set-Ups - Daikin A2 F Installation And Operating Instructions Manual

Rotex oil condensing boiler
Table of Contents

Advertisement

4

Set-up and installation

WARNING
Devices which have been set-up and installed incorrectly
may not operate properly and can be a health and safety
risk endangering human life.
▪ Only authorised and trained heating technicians may set
up and install the A2 F.
4.1
Dimensions and connection
dimensions
606
271
263
140
80
0
110
293
368
442
516
540
Image 4-1 Installation dimensions
Item
Designation
R
Minimum room height (see
H
Tab. 4-1
Legend for
Image 4-1
INFORMATION
To avoid increased cooling losses, we recommend the in-
stallation of SKB gravity brakes (accessory) or the sy-
phoning of the connection line.
Daikin/ROTEX A2 F
Oil condensing boiler A2 F
008.1546499_01 – 03/2018 – EN
736
A
A
Chap.
4.4.1)
4
4.2

Different set-ups

≥ 40 cm
(d)
(a)
1
C
93
(a)
C
4
53
(e)
C
53
C
83
(b)
5
Image 4-2 Different set-ups
Item
Designation
1-6
Installation versions (for a description, see
to
Chap.
4.2.3)
CA
Supply air (combustion air)
FG
Flue gas
RV
Rear ventilation
a
Installation version for ambient air-independent opera-
tion (flue gas/supply air concentric)
b
Installation version for conditional ambient air-independ-
ent operation (flue gas/supply air separate)
c
Installation version for ambient air-dependent mode
d
Longitudinally ventilated shaft with a fire-resistance
period of 90 minutes (30 minutes in low height residen-
tial buildings). Observe country-specific regulations for
fire-resistance periods!
e
Ventilation opening (1x150 cm
f
Rear ventilation opening (150 cm
Tab. 4-2
Legend for
Image 4-2
The A2 F is designed for ambient air-independent operation. It is
fitted as standard with a concentric flue gas /air supply pipe DN
80/125.
INFORMATION
In some cases, the resonance in the flue gas system can
amplify the noise at the mouth of the flue gas duct. The
noise level can be effectively reduced by using a silencer
(accessory: DN 80: E8 MSD or DN 110: E11 MSD).
Set-up and installation
CA
FG
RV
(d)
(a)
2
C
33
(a)
C
3
33
B
23
B
23P
(c)
6
B
33
B
53
B
(f)
53P
Chap. 4.2.1
2
or 2x75 cm²)
2
)
Installation and operating instructions
(e)
11

Advertisement

Table of Contents
loading

Table of Contents