8.2

Switching on the machine

1. If at all possible, run the machine without load and check that it is running smoothly.
2. If it runs perfectly, connect a load.
3. If this is possible using the available measuring equipment, check the bearing and stator
8.3

Switching off the external fan

If the controller does not switch off the external fan automatically, switch it off when the machine
is stopped.
8.4

Switching off the water-cooling system

If the controller does not switch off the air-to-water heat exchanger automatically, switch it off
when the machine is stopped.
8.5

Switching on again after an emergency switching-off

● Check the motor before restarting the driven machine after an emergency off.
● Eliminate all the causes that have led to the emergency off
8.6

Stoppages

The stoppage is a shutdown for a period of time, during which the machine is stopped but
remains at the location of use.
Under normal ambient conditions, e. g. the stopped machine is not exposed to any vibration,
no increased level of corrosion, etc. in general, the following measures are necessary during
stoppages.
8.6.1

Switching on the anti-condensation heater

If the machine has anti-condensation heating, then switch it on when the machine is not in
operation.
LOHER CHEMSTAR 1PS5
Operating Instructions 03/2014
Maximum number of permissible consecutive starts for machines on the power supply:
Three cold / two warm
The start conditions for converter machines can be found in the catalog.
winding temperatures.
Operation
8.6 Stoppages