Filling the cooling circuit
1. Fill the cooling circuit with water until the air is completely forced out of the cooling circuit.
2. Perform a pressure check to see whether the cooling water supply is airtight. In doing so,
If you do not then put the machine into operation, you must implement the measures necessary
during stoppages.
NOTICE
Bleed air from the cooling ducts
If the cooling ducts are not completely filled with water, sufficient machine cooling cannot be
guaranteed and the machine may overheat.
Ensure that the air is bled from the cooling ducts during filling and that the cooling ducts are
completely filled with water.
LOHER CHEMSTAR 1PS5
Operating Instructions 03/2014
do not exceed the maximum test pressure. The maximum permissible pressure can be
found on the rating plate.
5.4 Cooling water supply for machines with water cooling
Assembling