HP 5130-24G-4SFP+ EI Installation Manual page 64

5130 ei switch series
Table of Contents

Advertisement

identifying IRF member switch physical ports,
planning
IRF cabling scheme, 30,
IRF connections,
29
IRF member IDs,
28
IRF topology,
29
port
100/1000Base-X SFP,
connecting IRF physical ports,
identifying IRF member switch physical ports,
LED (100/1000Base-X SFP),
LED (SFP+),
53
setting up IRF fabric,
SFP+,
47
technical specifications,
port mode
LED,
49
power module
LED,
49
power supply
connecting –48 VDC power source,
connecting AC power source,
connecting RPS,
20
failure (troubleshooting),
grounding switch through AC power supply PE
wire,
15
installation, 16,
17
power,
18
removal, 16,
17
powering on switch,
26
preparing for installation,
preventing
EMI prevention,
5
procedure
configuring IRF basic settings,
connecting –48 VDC power source,
connecting AC power source,
connecting IRF physical ports,
connecting power,
connecting RPS,
20
grounding switch through AC power supply PE
wire,
15
grounding switch with grounding conductor
buried in the earth ground,
grounding switch with grounding strip,
30
45
32
52
27
45
20
19
34
3
32
20
19
32
18
15
13
30
grounding the switch,
identifying IRF master switch,
identifying IRF member switch physical ports,
installing power supply,
installing switch,
installing switch on 19-inch rack,
maintaining the switch,
mounting switch on workbench,
planning IRF connections,
30
planning IRF fabric installation site,
planning IRF member IDs,
planning IRF topology,
removing power supply,
securing AC power cord for built-in AC power
supply,
19
securing AC power cord for hot-swappable AC
power supply,
setting up IRF fabric,
troubleshooting built-in power supply failure,
troubleshooting garbled terminal display,
troubleshooting hot-swappable power supply
failure,
35
troubleshooting no terminal display,
troubleshooting power supply failure,
troubleshooting the switch,
R
rack
attaching mounting bracket to switch chassis,
mounting switch to workbench,
mounting the switch,
switch installation on 19-inch rack,
verifying switch installation (19-inch rack),
removing
power supply, 16,
RPS
connecting,
LED,
49
S
safety
EMI prevention,
grounding switch through AC power supply PE
wire,
15
grounding the switch,
62
13
28
17
8
8
34
12
29
28
29
17
19
27
34
12
1 1
17
20
5
13
30
28
34
36
36
34
9
8
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5130-24g-4sfp+ ei taa5130-24g-poe+-4sfp+ ei5130-24g-poe+-4sfp+ ei taa5130-48g-4sfp+ ei5130-48g-4sfp+ ei taa5130-48g-poe+-4sfp+ ei ... Show all

Table of Contents