Coffee Filters: Plastic Brew Basket: 9¾” X 4½” FETCO # F003 Stainless Steel Brew Basket: 13” X 5” FETCO # F002 *FETCO currently supplies 2.2 and 3.0 liter airpots. Aap brewers can also be configured for the other available sizes, 1.9 and 2.5 liters. Contact Information Phone: (800) 338-2699 (US &...
4.6 gal Electrical Configuration and Brewing Efficiency Heater Model Configuration Connection Phase CBS-31A/Aap (-1) 1 X 1300 w CBS-31A/Aap (-2) 1 X 1800 w CBS-31A/Aap (-3) 1 X 2300w CBS-32A/Aap (-1) 1 X 1800w CBS-32A/Aap (-2) 2 X 2300w Weight...
CBS-31A Electrical input and water connection in rear 10-3/8" 15-1/8" 7"DIA 10-3/4" Water Requirements: 20-75 psig. 1/4 gpm flow rate. Water inlet is 1/4" male flare CBS-31Aap Electrical input and water connection in rear 6-7/8" 14" 6-1/2" DIA. 10-3/4" Water Requirements: 20-75 psig. 1/4 gpm flow rate. Water inlet is 1/4" male flare Dimensional Drawings &...
Here are the key points to consider before installation: Electrical: All FETCO brewers require NEUTRAL. Ground is not an acceptable substitute. Installation without neutral may cause damage to the electronic components. The electronic controls require at least 105 volts. Less than 105 volts will cause erratic behavior from the brewer.
Page 6
Electrical Connection 1. Verify that the actual voltage at the electrical service connection is compatible with the specifications on the brewer’s serial number label. Make sure the electrical service includes neutral. 2. The temperature and water tank fill level are pre-set at the factory. There is no need to turn off the heaters during the installation process.
1. Turn the power switch • The power switch will illuminate to indicate that the brewer has power and is operating. • When the ready light required to gain full operating temperature will vary depending on the electrical configuration that was ordered, and the temperature of the incoming water.
Service Warranty All FETCO brewers come with a limited warranty. All warranty service must be pre-authorized by calling the FETCO Service Department at (800) 338-2699. Principles of Operation Fill System The fill system consists of a liquid level control board, a water level probe at the top of the tank, and a fill valve. As the water rises and touches the probe, continuity is established between the probe tip and the tank body, and the fill valve closes.
Adjustments Thermostat Adjustment: For equipment manufactured before April 2004 The brewer’s water tank temperature is factory set at 203°F (slightly lower for high altitudes, to prevent boiling). This setting will deliver water at 195°F ± 5° to the coffee grounds. Measure the temperature by holding a thermometer in the stream of water flowing out of the hot water faucet.
Timer Adjustment: For equipment manufactured before April 2004 The timers control the amount of water that is used for brewing. The dual sided brewer, (CBS-32A, & 32Aap) has separate timers to control each side independently. All timers are factory set to deliver the correct amount of water. There are three possible types of timers used: •...
Parts Drawing: CBS 31A & CBS 32A Aap brewers use the same parts, except for the tank, body, and legs. Call Tech. Support At (800) 338-2699 for assistance with these items D W G . 7 0 1 -0 0 4 R E V .
Timer/s are set too high -Adjust timers down to appropriate level Dispenser not empty -Empty the dispenser and try again -Call FETCO Service Dept. to discuss. (800) 338-2699 Improper dose -Measure and confirm correct dose Too many filter papers...
Page 15
(it is not magnetic) and it still passes water to the tank. (Disconnect the outlet side to see if it leaks water to the tank) Reverse osmosis water system. -Call FETCO Service Department to discuss. (Mineral content is too low for (800) 338-2699. liquid level control board to operate properly.)