Fireplace Installation; Secure Fireplace To Floor Or Framing; Finishing Material - Vermont Castings 33CFDV(N/P)(V/I)SB Installation And Operating Instructions Manual

Cfdv series direct vent
Table of Contents

Advertisement

FIREPLACE INSTALLATION

Finish Wall
12" (305 mm)
12"
8" (203 mm)
(305 mm)
11"
(279 mm)
10"
(254 mm)
8" (203 mm)
Top of Heat
Exhaust Vent
Side View
Side of Fireplace
Opening
Front View
Figure 6 –
Mantel Clearances
Never obstruct or modify the air inlet.
This may create a fi re hazard.
20306739
Stud
Header
6"
(152 mm)
2 "
(64 mm)
Standoffs
Stud
Wall
Combustible
Material Area
1"
1 "
3 "
2 "
4 "
45°
3"
5"
6"
SECURE FIREPLACE TO FLOOR OR
FRAMING
The fi replace must be secured to the fl oor and/or to framing
studs as shown in Figure 7. Use two (2) wood screws or
masonry/concrete screws to secure fi replace to the fl oor.
Use four (4) screws to attach fi replace to framing. The side
nailing fl anges are
thickness.

FINISHING MATERIAL

NOTE: Any wiring (i.e. remote control, wall switch, and
optional fan) must be done prior to fi nal fi nishing to avoid
costly reconstruction.
Only noncombustible materials (i.e. brick, tile, slate, steel,
FP3000
or other materials with a UL fi re rating of Zero) may be
used to cover the black surface of the appliance. A 300°F
minimum adhesive may be used to attach facing materials
to the black surface. If joints between the fi nished wall
and the fi replace surround are sealed, a 300°F minimum
sealant material (General Electric RTV103 or equivalent)
must be used.
Framing
Nailing
Flange
Screws
FP3013
Nailing
Flange
Screw
Figure 7 –
Securing Fireplace to Floor and Framing Studs
CFDV Series Gas Fireplace
1
" or
5
" to accommodate different wall
2
8
Finished Wall
Support Tabs
(Do Not Use for
Framing or Header)
Screw
Framing
Screw
Nailing
Flange
Screw
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

36cfdv(n/p)(v/i)sb42cfdv(n/p)(v/i)sb

Table of Contents