Check Gas Pressure - Millivolt; Electrical Installation - Millivolt; Electrical Wiring - Vermont Castings 33CFDV(N/P)(V/I)SB Installation And Operating Instructions Manual

Cfdv series direct vent
Table of Contents

Advertisement

ELECTRICAL INSTALLATION – MILLIVOLT

ELECTRICAL WIRING

This fi replace will work without any electrical supply.
Electricity is only needed to operate blower.
NOTE: If installed in mobile home, fi replace must be bolted
securely to fl oor.
JUNCTION BOX WIRING
1. This should be done before framing the fi replace. Wire
the receptacle into an electrical circuit. Wire with mini-
mum 60° C wire in accordance with prevailing codes.
2. Remove the external junction box cover by removing
the screw from the side of the outside fi rebox wall.
Junction box was installed at the factory.
3. The junction box cover has a factory installed "romex"
style strain relief connector. After connecting the wires,
route the wire leads through this connector. Refer to
the wiring diagram in Figure 59 (page 36).
Verify proper operation after servicing.
Figure 53 –
Millivolt Gas Pressure Check at Gas Valve
20306739
Pressure
Test "IN"
Pressure
Test "OUT"
HI/LO Knob
Pilot Adjustment Screw
Electrical connections should only
be performed by a qualified, licensed
electrician. Main power must be off when
connecting to main electrical power supply
or performing service. All wiring shall be
in compliance with all local, city and state
codes. The appliance, when installed, must
be electrically grounded in accordance
with local codes or in the absence of local
codes, with the National Electrical Code
ANSI/NFPA 70 (latest edition) and Canadian
Electrical Code, CSA C22.1.
DO NOT USE OPEN FLAME TO
CHECK FOR GAS LEAKS.
Label all wires before disconnecting when
servicing controls. Wiring errors can cause
improper and dangerous operation.
FP1979
CFDV Series Gas Fireplace
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

36cfdv(n/p)(v/i)sb42cfdv(n/p)(v/i)sb

Table of Contents