Daikin FBQ20EAVAK Installation Manual page 84

Split system air conditioner
Table of Contents

Advertisement

01_EN_3P281953-1B.fm Page 23 Tuesday, January 25, 2011 3:35 PM
All connection terminals
V Model
should be insulated by,
for example, attached
insulating sleeves.
Earth wiring
Transmission
wiring
Power supply
wiring
Stop valve
attachment plate
Y Model
Attach
an insulation
sleeve
Transmission wiring
Power supply wiring
Stop valve
attachment plate
23
Clamp
(accessories)
Control box
(Terminal strip)
Ground
Earth
wiring
Power supply
Clamp material
(accessories)
To use the single core wire as
the earth wire during the conduit
operation, secure the electric wire
and earth wire using the clamps
as shown in the picture right.
Direction for pulling out the wiring
Plug the pipe through-hole with putty or
insulating material (procured locally) so
as not to leave any gap and prevent
entry of small animals.
Use the knock hole on the side and rear
for the conduit (composite) operation.
Control box
How to connect the power
(Terminal strip)
supply wiring and transmission
wiring
1 2 3
L
N
Terminal plate
Earth wiring
Earth wiring
Power supply
between units
wiring
Transmission
wiring
Secure the power supply wiring and the transmission
wiring to the stop valve attachment plate using the clamping
material so that it does not move.
1 2 3 L1 L2 L3 N
Earth wiring
Earth wiring
between units
wire
Transmission
wiring
Fix to the stop valve fixing plate not to
move on the power supply wiring and
wiring between units.
Power supply
wiring
Transmission
wiring
Forward
Earth wiring
Earth wiring
Power supply
wiring
Earth wiring
Clamp
(accessories)
Backward
Sideways
Power supply and
earth wiring
English

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents