Download Print this page

Advertisement

Quick Links

Quick Installation Guide
X1-Hybrid 3.0KW-7.5KW
Packing List
X1-Hybrid G4
Bracket
series inverter.
10AWG European
Waterproof connector
terminals
with RJ45*4/3(Meter/
8AWG European
DRM/BMS)
terminals*3
RJ45 terminals*1
X1-Hybrid Series 3.0KW-7.5KW
Battery connection
Quick Installation Guide
terminals *1
Meter
*1(Optional)
*1
Note: "
☆
"attachments are not included in the M-series inverter attachment package and will be included in the X1-Matebox.
"▲"
is the standard accessory in the M-series inverter and the optional accessory in the D-series inverter.
"   " The inverter in Australia needs to be connected to DRM, which is 1 more communication line adapter than that in other countries.

I
The PV port wiring of X1-Hybrid G4 M series inverter has been completed. On X1-Matebox, the D series needs to be wired according to
the following steps.
Step 1. Turn off the DC switch, connect the PV module, prepare a
12 AWG PV cable, and find the PV (+) terminal and PV (-) terminal in
the package.
Negative terminal
PV cable
PV pin
Positive terminal
Step 3. The PV connector is divided into 2 parts, to the plug and the fastening head. Pass the cable through the fastening head and the
alignment plug. Note that the red and black lines correspond to different pairs of plugs. Finally, force the cable into the plug and hear a
"click" to indicate that the connection is complete.
Crimping Tool
Positive metal
Negative metal
terminal
terminal
Step 4. Tighten the fastening head and into insert the corresponding positive and negative (PV-/PV+) parts of the inverter.
Positive
PV1+
PV2+
PV1- PV2-
Negative
Battery Connection
I
Battery connection diagram:
ON
PV 1
PV 2
BAT
BMS
METER/CT
CAN
Upgrade
OFF
DONGLE
DRM
COM/LCD
Non-polar
DC MCB
Communication line connection
Power line connection
CAN/RS485
+
-
... ...
Note:
High voltage lithium battery
When using SolaX batteries, it is recommended that the number
of battery control (T-BAT-5.8) is 1 and the number of battery
modules (HV11550) is 1-3; the number of battery control (MC0600)
is 1 and the number of battery control (HV10230) is 1-4 pcs.
Battery port connection line of the X1-Hybrid G4 M series
inverter is on the X1-Matebox, just connect it. It is necessary to
wire the D series according to the following steps.
Step 1. Prepare 8 AWG battery power line , find the DC
plug (+), DC plug (-) in the accessory bag.
Diagonal
pliers
BAT plug (+)
BAT plug (-)
Power line
PV pin angle
(positive*2 , negative*2 )
Waterproof cover*1
(positive*2 , negative*2 )
*2
M5 inner hexagon bolt*1
(Expansion bolt ,Gasket,
OT terminal*1
Self-tapping bolt)*3
X1-Hybrid User Manual
3.0kW - 7.5kW
EN
Warranty Card*1
Pocket WiFi*1
Manual*1
PV Connection
Step 2. Use a wire stripper to strip the 7mm insulation layer of the wire
end.
Wire stripper
Positive PV pin
Positive terminal
Negative terminal
Step 2. Insert the striped cables into the DC plug (-) and DC Plug (+) respectively.
Spring
Cavity
DC plug (-)
DC plug (+)
Step 3. Press down on the spring by hand, you can hear a click sound, then push the
ends together, and tighten the screw joints.
Spring
Spring
Crack!
Step 4. Insert the battery power lines into the corresponding BAT port (+), (-) of the
inverter.
Note!
After the BMS communication between the battery
and the inverter is finished, the battery will work
normally.
Hammer drill(Bit φ10)
OT terminals press clamp
(0.5~6mm²)
Diagonal pliers
Crimping Tool
a ) Use a marker to mark drilling holes of the
bracket on the wall .
PV terminal
a)
d ) The bracket is aligned with the screw uses
the inner hexagonal wrench to screw the
tapping screw until the expansion bolt
"bang" is heard.
CT*1
d)
Diagram A: Neutral line and PE line are separated from each other, and
the common load is connected to the off-grid port;(For most countries)
X1-Hybrid G4
BAT
Grid
Breaker
Negtive PV pin
Battery
Diagram C: Neutral line and PE line are combined togeter, and the
common load is connected to the off-grid port;(Apply to Australia)
X1-Hybrid G4
BAT
Grid
Breaker
Battery
The Grid and Off-grid ports of X1-Hybrid G4 M series inverter have been connected, and the D series needs to be wired according to the following
steps.
Step 1. Prepare a Grid cable (three-core wire) and an Off-grid cable (two-core wire), and then find the European terminal and waterproof cover in
the accessory bag.
Grid( Triple Core Cable)8AWG*3 Off-grid( Double Core Cable)10AWG*2
Grid Cable and Micro-breaker recommended
Model
X1-Hybrid-3.0-D X1-Hybrid-3.7-D X1-Hybrid-5.0-D X1-Hybrid-6.0-D
Cable (copper)
4-6mm²
The cable must pass through here
Micro-Breaker
32A
Model
X1-Hybrid-3.0-M X1-Hybrid-3.7-M X1-Hybrid-5.0-M X1-Hybrid-6.0-M X1-Hybrid-7.5-M
Cable (copper)
3-4mm²
Micro-Breaker
25A
Step 2: The Grid and Off-grid cables go through the corresponding Grid and Off-grid ports of the waterproof cover. Remove the 12mm
insulation layer at the end of the wire. Insert the European-style terminals respectively, and make sure that the stripped ends are inserted into
the European-style terminal ,and finally use crimping pliers to press tightly.
Grid
Note: BAT port, not PV port!
Note: The positive and negative
wires of the battery are not
allowed to be reversed!
Tool Preparation
DC Voltage range ≥1100 V DC
Torque screwdriver
Diagonal pliers
Hexagon keys
Euro terminal crimping tool
Marker
Mounting Steps
b) Drill holes at marked spots with depth of 80mm.
Hammer
Φ10
b)
drill
e) Hang the buckle on the inverter to the
corresponding position of the backplane.
Screw
e)
Grid and Off-grid Connection
Diagram B: Neutral line and PE line are separated from each other,
all loads connect to the Off-grid port;(For most countries)
X1-Hybrid G4
PV 1
PV 2
CT
PV 1PV 2
Breaker
CT
Main Breaker
Off-grid
N
PE
X1-Matebox
Grid
E-BAR
RCD
RCD
off-grid loads
Loads
N-BAR for off-grid loads
N-BAR for loads
Diagram D: Neutral line and PE line are combined together, all
loads connect to the Off-grid port;(Apply to Australia)
PV 1
PV 2
CT
PV 1PV 2
Main Breaker/RCD
Breaker
CT
Off-grid
N
Grid
E-BAR
RCD
RCD
off-grid loads
Loads
N-BAR for off-grid loads
N-BAR for loads
10AWG Euro Terminal*2
X1-Hybrid-7.5-D
Model
8-10mm²
8-10mm²
8-10mm²
6-8mm²
40A
50A
50A
50A
Cable (copper)
Micro-Breaker
3-4mm²
4-6mm²
4-6mm²
6-8mm²
25A
32A
32A
40A
Off-grid
Grid
Off-grid
(Crosshead M5)
Socket wrench set(Hexagon)
Multifunction terminal crimping
Utility knife
tool (RJ45)
Tape ruler
Rubber hammer
Spirit level
c) Insert expansion bolt into the hole, use
rubber hammer to knock the expansion
screw bolt into the wall.
Expansion
bolts
Rubber hammer
c)
Torque :
2.5±0.2N
·
m
f ) Use the inner hexagonal wrench to tighten
the inner hexagonal screw on the right side of
the inverter.
Hexagon keys
f)
Torque :
·
1.2±0.1N
m)
BAT
CT
Grid
Off-grid
Main Breaker
N
PE
E-BAR
Grid
Battery
Distrbution Box
Loads
N-BAR for loads
X1-Hybrid G4
BAT
CT
Off-grid
Grid
Main Breaker
X1-Matebox
N
E-BAR
Grid
Battery
Distrbution Box
Loads
N-BAR for loads
Eurp Terminal 8AWG *3
Waterproof cover
Off-grid Cable and Micro-breaker recommended
X1-Hybrid-3.0-D
X1-Hybrid-3.7-D
X1-Hybrid-5.0-D
X1-Hybrid-6.0-D
X1-Hybrid-7.5-D
X1-Hybrid-3.0-M
X1-Hybrid-3.7-M
X1-Hybrid-5.0-M
X1-Hybrid-6.0-M
X1-Hybrid-7.5-M
3-4mm²
3-4mm²
4-6mm²
4-6mm²
6-8mm²
25A
25A
32A
32A
40A
GRID Off-grid
Torque screwdriver
L N PE L N
·
( Torque: 0.2±0.1N
m)

Advertisement

loading
Need help?

Need help?

Do you have a question about the X1 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for SolaX Power X1

  • Page 1 N-BAR for loads N-BAR for loads The Grid and Off-grid ports of X1-Hybrid G4 M series inverter have been connected, and the D series needs to be wired according to the following steps. Step 1. Prepare a Grid cable (three-core wire) and an Off-grid cable (two-core wire), and then find the European terminal and waterproof cover in Battery connection diagram: Step 2.
  • Page 2 Communication Connection Grounding Connection (manodatory) (BMS/Meter/CT/DRM/COM) The ground wire port of X1-Hybrid G4 M series inverter has been connected, and the D series needs to be wired according to the following steps. Electric meter connection diagram Ø COM PIN Definition Step 1.