Dell EMC VxFlex Ready Node 13G Manual page 24

Hide thumbs Also See for EMC VxFlex Ready Node 13G:
Table of Contents

Advertisement

Configuring the Hardware
Hardware Configuration and Operating System Installation Guide - Windows Servers
24
10. (Optional) Check each VxFlex Ready Node server's log for successful
competition:
a. After the update script completes, press Alt+F2 to access a user console,
and then Enter to log in.
b. Check the log contents for errors:
less /bundleapplicationlogs/apply_components.log
For more information, see
c. Press q to exit the log viewer, and then Alt+F1 to access the original console
screen.
11. Reboot the VxFlex Ready Node server and allow the update and configuration
jobs to complete. Power-cycle the server using the appropriate Power menu
option.
12. For each VxFlex Ready Node server, after the updates are finalized, clear the
iDRAC job queue using the iDRAC GUI:
a. From your Internet browser, go to https://
b. In the DELL Console Login window, type these credentials:
username: root
l
<password> (for Dell-supplied nodes) or password (for EMC-
password:
l
supplied nodes)
c. Click Login.
d. In the iDRAC GUI navigation pane, select the Maintenance tab, and then
select the Job Queue tab.
e. Ensure that all jobs have completed successfully. Any job failures may
require re-running the bootable ISO, or further troubleshooting.
f. Select the checkbox for all of items in the Job Queue list, and then click
Delete.
13. Continue with OS installation and configuration, VxFlex OS deployment, and
other required tasks.
At the end of the process, the BIOS password changes to emcbios.
Troubleshooting the Hardware ISO
<iDRAC_IP_address> .
on page 80 .

Advertisement

Table of Contents
loading

Table of Contents