3 - MAINTENANCE
ANY INTERNAL INSPECTIONS OR REPAIRS MUST BE CARRIED OUT BY QUALIFIED
BEFORE BEGINNING MAINTENANCE OPERATIONS, UNPLUG THE MACHINE FROM
THE MAINS AND WAIT FOR THE INTERNAL CAPACITORS TO DISCHARGE (2
3.1 - Periodic inspection, cleaning.
Periodically make sure that air is flowing properly within the aeration tunnel.
Remove any dirt or dust to ensure adequate cooling of the internal parts of the power source.
Check the condition of the output terminals, output and power supply cables of the power
source; replace if damaged.
Check the condition of the internal power connections and connectors on the electronic
boards; if you find "loose" connections, tighten or replace the connectors.
3.2 - Operating sequence (fig. 3.2.1).
The following sequence represents correct functioning of the machine. It may be used as a
guiding procedure for troubleshooting.
It must be carried out after each repair without any errors.
Steps marked with this symbol refer to actions by the operator.
♦ The operations marked with this symbol refer to machine responses that must occur following
an operator action.
3.2.1 - Power source commands and signals.
3.302.113
WARNINGS
PERSONNEL.
MINUTES).
NOTE
6
20/11/02