Maintenance; Periodic Inspection, Cleaning; Sequence Of Operations (Fig. 3.2.1); Power Source Commands And Signals - Cebora POWER ROD 1365 Service Manual

Hide thumbs Also See for POWER ROD 1365:
Table of Contents

Advertisement

CEBORA S.p.A.

3 - MAINTENANCE

ANY INTERNAL INSPECTIONS OR REPAIRS MUST BE CARRIED OUT BY QUALIFIED
BEFORE BEGINNING MAINTENANCE OPERATIONS, UNPLUG THE MACHINE FROM
THE MAINS AND WAIT FOR THE INTERNAL CAPACITORS TO DISCHARGE (3

3.1 - Periodic inspection, cleaning.

Periodically make sure that air is flowing properly within the aeration tunnels.
Remove any dirt or dust to ensure adequate cooling of the internal parts of the power source.
Check the condition of the output terminals, output and power supply cables of the power
source; replace if damaged.
Check the condition of the internal power connections and connectors on the electronic
boards; if you find "loose" connections, tighten or replace the connectors.

3.2 - Sequence of operations (fig. 3.2.1).

The following sequence represents correct functioning of the machine. It may be used as a
guiding procedure for troubleshooting.
It must be carried out after each repair without any errors.

3.2.1 - Power source commands and signals.

3.302.104
WARNINGS
PERSONNEL.
MINUTES).
5
08/11/02

Advertisement

Table of Contents
loading

This manual is also suitable for:

252

Table of Contents