About The Box; Overview: About The Box; Indoor Unit; To Unpack And Handle The Unit - Daikin FXDA15A2VEB Installer And User Reference Manual

Vrv system air conditioner
Hide thumbs Also See for FXDA15A2VEB:
Table of Contents

Advertisement

14 About the box

14.1 Overview: About the box

14.2 Indoor unit

14.2.1 To unpack and handle the unit

14.2.2 To remove the accessories from the indoor unit

FXDA10~63A2VEB
VRV system air conditioner
4P599621-1A – 2020.10
This chapter describes what you have to do after the box with the indoor unit is
delivered on-site.
It contains information about:
Unpacking and handling the unit
Removing the accessories from the unit
Keep the following in mind:
At delivery, the unit MUST be checked for damage. Any damage MUST be
reported immediately to the claims agent of the carrier.
Bring the packed unit as close as possible to its final installation position to
prevent damage during transport.
Prepare the path along which you want to bring the unit inside in advance.
Use a sling of soft material or protective plates together with a rope when lifting
the unit. This to avoid damage or scratches to the unit.
1 Lift the unit by holding on to the hanger brackets without exerting any
pressure on other parts, especially on refrigerant piping, drain piping and
other resin parts.
1
A
B
2
C
14
About the box
|
Installer and user reference guide
41

Advertisement

Table of Contents
loading

Table of Contents