Gas Supply; Gas Feeding Line - Riello RS 45/M C05 Installation, Use And Maintenance Instructions

Forced draught gas burners
Table of Contents

Advertisement

5.9

Gas supply

Explosion danger due to fuel leaks in the
presence of a flammable source.
Precautions: avoid knocking, attrition, sparks and
heat.
Make sure the fuel shut-off valve is closed before
performing any operation on the burner.
The fuel supply line must be installed by qualified
personnel, in compliance with current standards
and laws.
ATTENTION
5.9.1

Gas feeding line

Key (Fig. 18 - Fig. 19 - Fig. 20 - Fig. 21)
1
Gas input pipe
2
Manual valve
3
Vibration damping joint
4
Pressure gauge with push-button cock
5
Filter
6A Includes:
– filter
– safety valve
– pressure adjuster
– working valve
6C Includes
– safety valve
– working valve
6D Includes:
– safety valve
– working valve
7
Minimum gas pressure switch
8
Leak detection control, provided as an accessory or integrat-
ed, based on the gas train code. In compliance with the EN
676 standard, the leak detection control is compulsory for
burners with maximum outputs over 1200 kW.
9
Gasket, for "flanged" versions only
10 Pressure adjuster
11 Train-Burner adaptor, supplied separately
P2 Upstream pressure of valves/adjuster
P3 Upstream pressure of the filter
L
Gas train, supplied separately
L1 The responsibility of the installer
Installation
MB
20057264
MBC
20062223
DMV
20062227
CB
20062228
17
GB
Fig. 18
Fig. 19
Fig. 20
Fig. 21
20159575

Advertisement

Table of Contents
loading

This manual is also suitable for:

2015920920159210

Table of Contents