Viessmann Vitocell 100-E Installation And Service Instructions For Contractors page 9

Heating water buffer cylinder
Table of Contents

Advertisement

Installation
(cont.)
Fig. 5
1. At the back of the cylinder: Attach clip fasteners to
the edges of the right and left sections of the ther-
mal insulation jacket. Place the thermal insulation
jacket around the cylinder body.
Note
Leave the clip fasteners in the first notch.
2. At the front of the cylinder: Attach clip fasteners to
the edges of the right and left sections of the ther-
mal insulation jacket.
1.
4.
3.
3. Push the clip fasteners at the back of the cylinder
4. Push the clip fasteners at the front of the cylinder
2.
as close together as possible.
as close together as possible.
Installation sequence
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Svpa

Table of Contents