POWER ON
Switch the MBMS on after all the BMS units turn on successful:
TIPS:
The battery string's system will check itself. Self-check will be finish within 10sec.
If the BMS can't receive communication from upper equipment because of the
communication is off, the "STATUS" lamp will light red after 30sec. That doesn't mean
failure exists, it means this battery string is ok while the external communication is off.
Page 25
Figure 8: MBMS power switch