Download Print this page

Advertisement

Quick Links

Owner's Manual & Assembly Instructions
CM01
Model No.
715830118
Storage Area: 129 Sq. Ft.
12,0 m
2
BUILDING DIMENSIONS * Size rounded o to the nearest foot
*Approx.
Size
10' x 14'
121" x 160 1/4"
3,0 m x 4,0 m
307,3 cm x 407,0 cm
CO1014 C1
VS1014 C1
YT1014 C1
SG1014FB
Missing Parts, Questions on Assembly?
Call: 1-800-851-1085 or assist@arrow-
Do not return to dealer, they are not
equipped to handle your requests.
852 Cu. Ft.
24,1 m
3
Exterior Dimensions
Base
(Roof Edge to Roof Edge)
Size
Width
123 1/4" 162 3/4"
313,1 cm 413,4 cm
DK1014 B1
VY1014 A1
697.68604 A1
sheds.com
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
Depth
Height
Width
87 7/8"
118 1/4"
223,2 cm
300,4 cm
LX1014 C1
WV1014 C1
697.68630 A1
Interior Dimensions
(Wall to Wall)
Depth
Height
157 1/2" 86 5/8"
400,1 cm 220,0 cm
Door
Opening
Width
Height
55 1/2"
60"
141,0 cm 152,4 cm

Advertisement

loading

Summary of Contents for Arrow SG1014FB Series

  • Page 1 WV1014 C1 YT1014 C1 697.68604 A1 697.68630 A1 SG1014FB Missing Parts, Questions on Assembly? Call: 1-800-851-1085 or assist@arrow- sheds.com Do not return to dealer, they are not equipped to handle your requests. 715830118 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES Storage Area: 129 Sq.
  • Page 3 We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground (Available at your local dealer, Arrow's website arrowsheds.com or call Arrow's Customer Service department 1-800-851-1085) or you...
  • Page 4 PLAN AHEAD..Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building.
  • Page 5 SAFETY FIRST..Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various •Practice caution with the tools being used in pieces of your building since some contain the assembly of this building. Be familiar with sharp edges.
  • Page 6 In snow country, Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation. Contact Arrow as outlined on the Ordering Accessories page to place an order.
  • Page 7 Model No. AT101 Model No. AK100 Heavy-duty galvanized steel bars that New concrete anchor system permits t all 10' (3,0 m) wide Arrow buildings. anchoring any size Arrow building They install quickly and easily to directly to a concrete slab. Each kit...
  • Page 8 We recommend that you purchase accessory items from your local storage building dealer whenever possible; however, because the full line of accessories is not always available from all dealers, Arrow is o ering them to you on a direct basis.
  • Page 9 OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.). If you choose this option Arrow has a simple kit available to provide a oor inside the shed to keep stored items o the ground. This kit can be used to support a plywood oor (wood not included) or be lled with sand/rock to provide a solid surface.
  • Page 10 It is important that the entire oor frame be anchored after the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) Recommended for use with any suggested base.
  • Page 11 Bolt (240) Screw (446) 65109 67468 66646 #8-32 Acorn Nut (4) Peak Cap (6) 66045 Washer (521) (Packed with Screws) (Arrow Logo) Handle (2) (14 sheets of 40) 66183 66769 6228 66382 Roof Trim Cap Door Slide (4) Track Support (2) Lower Door Guide (4) (2 right &...
  • Page 12 Parts List SO12et ctr Assembly Part Part Quantity Check Key No. Number Description In Carton List 3719 Door Handle Brace 9373 Front Wall Panel 6020 Corner Panel 6108 Large Right Gable 6109 Large Left Gable 6114 Small Right Gable 6115 Small Left Gable 6188 Right Roof Panel...
  • Page 13 Assembly by Key No. SO13et ctr...
  • Page 14 Step 1 8934 Ramp (1) Parts Needed For 9367 Front Floor Frame (2) Floor Frame Assemblies 8936 Rear Floor Frame (2) SO14ctr 10387 Side Floor Frame (4) (13) 9367 The front oor frame is made up of 8934 three pieces. The side floor frames and the rear floor frame are made 9367 up of two pieces.
  • Page 15 5986 Rear Wall Angle (2) Step 2 Parts Needed For 10389 Rear Wall Channel (2) Frame Assemblies 10388 Side Wall Channel (4) SO15 ctr 10391 Side Wall Angle (4) Rear Wall Channel 10389 118 1/8" 300,0 cm (27) 10389 The main frame pieces reinforce the walls.
  • Page 16 Step 3 Parts Needed For 10386 Roof Beam (8) Roof Beam Assemblies SO16ctr 10386 (30) 10386 The roof beams join the two gables Roof Beam 159 3/8" 404,8 cm and support the roof panels. The main roof beam is made up of four pieces overlapped back to back at the center.
  • Page 17 Step 4 Parts Needed For 6403 Door Track Splice (1) Door Track Assembly 9366 Door Track (2) A17 ctr NOTE: Door Track Splice (painted part) 6403 The door track assembly supports the sliding doors and reinforces the front wall. It is made up of three pieces. Using the door track splice, (painted), join the door track (galvanized) pieces end-to-end as...
  • Page 18 Step 5 Front Floor Assembly (1) Parts Needed For Side Floor Assembly (2) Floor Frame Rear Floor Assembly (1) SO18 ctr RIGHT REAR Assemble the four corners of 10387 the oor frame using two screws at each corner as shown. At the front corners fasten bolts through from the bottom with nuts on top.
  • Page 19 Step 6 Parts Needed For 6515 Wall Panel (2) 9373 Front Wall Panel (2) Corners 6020 Corner Panel (4) SO19 ctr Narrow Side 6020 (34) Wide Side NOTE REAR The remainder of the building assembly 6020 requires many hours and more than one person.
  • Page 20 Step 7 Parts Needed For Rear Wall Channel Assembly (1) Mid Frames Side Wall Channel Assembly (2) SO20 ctr (20) The mid frame pieces give rigidity to the side and rear walls. Fasten the rear wall channel across the middle of the rear wall using screws.
  • Page 21 Step 8 Door Track Assembly (1) Parts Needed For Rear Wall Angle Assembly (1) Top Frames Side Wall Angle Assembly (2) SO21 ctr (26) The top frame pieces give rigidity to the walls and provide a surface for attaching the gables which support the roof.
  • Page 22 Step 9 Parts Needed For 6515 Wall Panel (10) Wall Panels SO22 ctr STEP (144) (15) Crimped Rib STEP Each wall panel has a crimped rib Underneath on one side. The crimped rib should go under the rib of the panel that 6515 Detail Showing follows it.
  • Page 23 Step 10 Parts Needed For 9369 Door Jamb (2) Front Channel/Door Jamb 9365 Front Wall Channel (2) SO23 ctr 9365 (18) STEP The door jambs reinforce the door opening and provide an attractive INSIDE OF trim. Follow these steps for both BUILDING door jambs.
  • Page 24 6108 Large Right Gable (2) Step 11 Parts Needed For 6109 Large Left Gable (2) 6114 Small Right Gable (2) Gable Assemblies 6115 Small Left Gable (2) SO24et ctr 6085 Roof Beam Bracket (4) 69835 Green Edge Trim (Plastic Piece) (16) STEP The gables go on top of the front and...
  • Page 25 Left Gable Assemblies (2) Step 12 Parts Needed For Right Gable Assemblies (2) Gables/Roof Beams Single Roof Beam Assemblies (2) SO25 ctr 6636 Gable Brace (2) (28) (12) Lift and fasten a right and left gable, under angle at corner, to the door track and rear wall angle with screws.
  • Page 26 Step 13 Parts Needed For Main Roof Beam Assembly (1) Roof Beam/Braces 6227 Roof Beam Brace (2) SO26 ctr STEP Fasten the track supports to the front gable assembly only, as shown. Track Supports 6228 Wrap the weather stripping tape around the two joined edges of the large left and right gables.
  • Page 27 Step 14 Parts Needed For 6188 Right Roof Panel (1) Right Roof Panel SO27et ctr Installing the roof panels is best done with a step ladder. Install the rst roof panel at the back right corner of the building. Each screw and bolt in the roof requires a washer.
  • Page 28 Step 15 Parts Needed For 6189 Left Roof Panel (1) 6538 Roof Panel (2) Ridge Caps & Panels 6797 Ridge Cap (3) SO28 ctr Screws To Roof Beam (21) (22) Install a left roof panel 6189 at Fasten at Fasten At the left rear corner of the roof.
  • Page 29 Step 16 Parts Needed For 6538 Roof Panel (4) Ridge Caps & Panels 6869 Ridge Cap (3) SO29 ctr (16) (32) Install two roof panels 6538 work- ing side to side. Cover the notched areas of the roof panels with strips of NOTE weather stripping tape and continue If roof beam holes do not line up...
  • Page 30 6538 Roof Panel (2) Step 17 Parts Needed For 6797 Ridge Cap (3) Ridge Caps & Panels 6188 Right Roof Panel (1) SO30 ctr 6189 Left Roof Panel (1) (36) (72) Reducing Large Gable Bulge Install the third ridge caps 6797 Loosen eight bolts and nuts shown.
  • Page 31 Step 18 Parts Needed For 6893 Left Side Roof Trim (2) 6892 Right Side Roof Trim (2) Roof Trim 6015 Side Roof Trim (2) SO31 ctr (10) Attach the right, left and side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap.
  • Page 32 3719 Door Handle Brace (2) Step 19 Parts Needed For 10475 Right and Left Doors (2) Door Assembly 10497 Horizontal Door Brace (4) SO32 ctr 6278 Vertical Door Brace (2) (12) The steps on this page tell how to assemble the right door. You will per- form exactly the same procedures for the left door.
  • Page 33 Step 20 Parts Needed For Right Door Assembly (1) Door Installation & Adjustment Left Door Assembly (1) SQ33 ctr Horizontal Door Brace Gable Door Track Door Slide From inside the building, put the bottom of the right door assembly (on your left when you are inside the building) behind door jamb into the front frame track.
  • Page 34 Anchoring and Floor Frame XA34 Anchoring Anchor your building at this time. Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time.
  • Page 35 SOME FACTS ABOUT RUST XA35 SOME FACTS ABOUT RUST 1. Avoid nicking or scraping the coating surface, Rusting is a natural oxidizing process that occurs inside and out. when bare metal is exposed to moisture. Problem areas include screw holes, unfinished edges, or 2.
  • Page 36 CO1014 C1 DK1014 B1 LX1014 C1 VS1014 C1 VY1014 A1 WV1014 C1 YT1014 C1 697.68604 A1 697.68630 A1 SG1014FB CM36 715830118...