Further details regarding the individual steps
Cleaning the burner
A
B
Initial start−up, inspection and maintenance
F
1. Release the fitting C on the gas
2. Remove the venturi mixer pipe E
3. Remove the venturi mixer pipe E
E
D
4. Pull the connecting cables "100"
C
5. Clean the fan housing and
6. If required, vacuum the inside of
(cont.)
supply pipe D.
from the fan A.
with the gas combination valve B
and the gas supply pipe D.
Note
187 kW version is shown. For
larger burners, the rotary damper
with drive is fitted to the
position E.
and "100a" off the fan A and
remove the fan A.
impeller with compressed air.
the burner gauze F .
19