Troubleshooting; Installation; In-Band Access - Edge-Core ECS2000-50T Installation Manual

50-port layer 2 gigabit ethernet switch
Table of Contents

Advertisement

| Troubleshooting

A
A
PPENDIX

Installation

I
NSTALLATION
Verify that all system components have been properly installed. If one or more
components appear to be malfunctioning (such as the power cord or network
cabling), test them in an alternate environment where you are sure that all the
other components are functioning properly.
I
-B
A
N
AND
CCESS
You can access the management agent in the switch from anywhere within the
attached network using a web browser, or other network management software
tools. However, you must first configure the switch with a valid IP address,
subnet mask, and default gateway. If you have trouble establishing a link to the
management agent, check to see if you have a valid network connection. Then
verify that you entered the correct IP address. Also, be sure the port which you
are connecting to the switch has not been disabled. If it has not been disabled,
then check the network cabling that runs between your remote location and the
switch.
C
AUTION
Telnet sessions. If the maximum number of sessions already exists, an
additional Telnet connection will not be able to log into the system.
The management agent can accept up to four simultaneous
:
– 53 –

Advertisement

Table of Contents
loading

Table of Contents