HOT-WATER DISPENSING PIPE - This operation must be carried out at the end of each working day
DO NOT
GRILLE AND DRIP BASIN - This operation must be carried out at the end of each working day
1.
2. Extract the basin.
3.
DO NOT
DRAINING TRAY
- This operation must be carried out every 7 days
1.
tray.
2.
- This operation must be carried out at the end of each
working day
BODYWORK - This operation must be carried out at the end of each working day
1
1
2
2