Initial Washing:
After installation it is recommended to perform the initial washing of the system. For this:
shut off the tank
■
valve
15-30 min
wait for water to arrive at the faucet (it may take a while, especially first time, water foam
■
and air may be going out of the system); wait for 15-30 minutes for more or less steady
weak flow from the faucet.
shut off the faucet, and open the tank valve.
■
wait for tank full refill then drain the tank by opening the faucet.
■
repeat tank refill and drain once again by shutting off and opening the faucet, then shut off
■
the faucet and wait for tank refill with clean water.
your system is ready for use.
■
12
open cold water
■
supply valve
open the inlet
■
valve
open the filtered
■
water faucet