Commissioning, Inspec-Steps - Commissioning, Inspection And Maintenance - Viessmann B0KA Installation And Service Instructions Manual

Table of Contents

Advertisement

Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
1. Commissioning the system............................................................................................... 30
2. Filling the heating system................................................................................................. 32
4. Venting the heating system............................................................................................... 34
5. Checking the gas type....................................................................................................... 34
6. Removing the front panel.................................................................................................. 35
7. Checking the static pressure and supply pressure........................................................ 36
8. Function sequence and possible faults........................................................................... 37
9. Setting the maximum heating output............................................................................... 38
10. Performing an actuator test.............................................................................................. 38
11. Adjusting pump rate of integral circulation pump.......................................................... 38
12. Leak test on balanced flue system (annular gap check)................................................ 40
14. Removing the burner......................................................................................................... 41
15. Checking the burner gasket and burner gauze assembly.............................................. 42
17. Checking the back draught safety devices...................................................................... 43
18. Cleaning the heating surfaces.......................................................................................... 44
19. Checking the condensate drain and cleaning the trap................................................... 44
20. Installing the burner........................................................................................................... 46
23. Checking the expansion vessel and system pressure................................................... 47
25. Checking the electrical connections for firm seating..................................................... 48
26. Checking all gas equipment for leaks at operating pressure........................................ 48
27. Fitting the front panel........................................................................................................ 48
28. Checking the combustion quality..................................................................................... 49
30. Matching the control unit to the heating system............................................................ 50
31. Adjusting the heating curves............................................................................................ 50
32. Instructing the system user.............................................................................................. 50
Commissioning, inspection, maintenance
Page
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vitodens 050-wBpkaB0ka-m

Table of Contents