Mounting The Boiler And Making Connections; Removing The Front Panel; Mounting The Boiler On The Pre-Plumbing Jig Or Mounting Frame - Viessmann B0KA Installation And Service Instructions Manual

Table of Contents

Advertisement

Installation sequence

Mounting the boiler and making connections

Removing the front panel

3.
2.
1.
2x
Fig. 5
1. Unlock the front panel on the underside (push in),
2. Swivel the front panel forwards slightly and lift
using a screwdriver or similar tool.
away upwards.

Mounting the boiler on the pre-plumbing jig or mounting frame

Note
Various installation components can be found in a sep-
arate pack. Keep the installation components safe, as
they will be required for later installation.
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vitodens 050-wBpkaB0ka-m

Table of Contents