Checking For Leaks; Fixing Leaks - Air Lift LoadLifter 5000 Ultimate Installation Manual

Hide thumbs Also See for LoadLifter 5000 Ultimate:
Table of Contents

Advertisement

LoadLifter 5000 Ultimate
4. Install the inflation valves as shown in Figure 10.
5 . Keep at least 6" of clearance between the air line and heat sources, such as the exhaust
6 . Cut off air line leaving approximately 12" of extra air line . Insert the air line into the air

CHECKING FOR LEAKS

1. Inflate the air spring to 30 p.s.i.
2. Spray all connections and the inflation valves with a solution of
3. After the test, deflate the springs to the minimum pressure required to restore the Normal
NOTE
Check the air pressure again after 24 hours. A 2 to 4 p.s.i. loss after initial installation is
normal. Retest for leaks if the loss is more than 5 lbs.

FIXING LEAKS

1. If there is a problem with the swivel fitting, then:
a. Check the air line connection by deflating the spring and removing the line by pulling the
MN-857
pipes, muffler, or catalytic converter. Avoid sharp bends and edges. Leave at least 2"
of slack when securing the air lines to allow for any movement that might pull on the air
line (Figure 11) .
fitting. Simply push the air line into the 90° swivel fitting until it bottoms out (
line should be in the fitting).
water to check for leaks . You should be able to spot leaks easily by looking for bubbles
in the soapy water .
Ride Height, but not less than 10 p .s .i .
collar against the fitting and pulling firmly on the air line. Trim 1" off the end of the air
fig. 10
/
" of air
9
16
fig. 11
/
liquid dish soap and
/
1
4
5
5
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

88202

Table of Contents