3 . Mount the jounce bumper under the frame using O .E .M . hardware . Tighten securely
NOTE
Drop the axle slightly if necessary to position the jounce bumper between the frame and
axle (Figure 8).

INSTALLING THE AIR LINES

NOTE
When installing the air lines, there must be at least six inches of clearance between the air
lines and any heat sources.
1. Choose a convenient location for mounting the inflation valves. Popular locations for the
NOTE
Whatever the chosen location is, make sure there is enough clearance around the inflation
valves for an air chuck.
2 . Drill a
3 . Cut the air line assembly (AA) in two equal lengths .
WHEN CUTTING OR TRIMMING THE AIR LINE, USE A HOSE CUTTER (AIR LIFT P/N
CAUTION
10530), A RAZOR BLADE OR A SHARP KNIFE. A CLEAN, SQUARE CUT WILL ENSURE
AGAINST LEAKS. DO NOT USE WIRE CUTTERS OR SCISSORS TO CUT THE AIR
LINE. THESE TOOLS MAY FLATTEN OR CRIMP THE AIR LINE CAUSING IT TO LEAK
AROUND THE O-RING SEAL INSIDE THE ELBOW FITTING (FIGURE 9).
8
(Figure 8) .
inflation valve are:
The wheel well flanges; The license plate recess in bumper; Under the gas cap access
door; Through license plate (Figure 11).
/
" hole to install the inflation valves.
5
16
LoadLifter 5000 Ultimate
fig. 8
fig. 9
MN-857