Installation For The First Time - Vivax ACP-12CH35AERI Service Manual

Hide thumbs Also See for ACP-12CH35AERI:
Table of Contents

Advertisement

5.4 Installation for the first time

Air and moisture in the refrigerant system have
undesirable effects as below:
● Pressure in the system rises.
● Operating current rises.
● Cooling or heating efficiency drops.
● Moisture in the refrigerant circuit may freeze
and block capillary tubing.
● Water may lead to corrosion of parts in the
refrigerant system.
Therefore, the indoor units and the pipes
between indoor and outdoor units must be leak
tested and evacuated to remove gas and moisture
from the system.
Gas leak check (Soap water method):
Apply soap water or a liquid neutral detergent
on the indoor unit connections or outdoor unit
connections by a soft brush to check for leakage
of the connecting points of the piping. If bubbles
come out, the pipes have leakage.
1. Air purging with vacuum pump
1) Completely tighten the flare nuts of the indoor
and outdoor units, confirm that both the 2-way
and 3-way valves are set to the closed position.
2) Connect the charge hose with the push pin of
handle lo to the 3-way valves gas service port..
3) Connect the charge hose of handle hi
connection to the vacuum pump.
4) Fully open the handle Lo of the manifold valve.
5) Operate the vacuum pump to evacuate.
6) Make evacuation for 30 minutes and check
whether the compound meter indicates -
0.1Mpa. If
0.1Mpa after pumping 30 minutes, it should be
pumped 20 minutes more. If the pressure can't
achieve -0.1Mpa after pumping 50 minutes,
please check if there are some leakage points.
Fully close the handle Lo valve of the manifold
valve and stop the operation of the vacuum pump.
Confirm that the gauge needle does not move
(approximately 5 minutes after turning off the
vacuum pump).
7) Turn the flare nut of the 3-way valves about 45°
counterclockwise for 6 or 7seconds after the
gas
coming out, then tighten the flare nut again. Make
sure the pressure display in the pressure indicator
is a little higher than the atmosphere pressure.
Then remove the charge hose from the 3 way
valve.
8) Fully open the 2 way valve and 3 way valve
and securely tighten the cap of the 3 way valve.
2. Air purging by refrigerant
Procedure:
1). Confirm that both the 2-way and 3-way valves
are set to the closed position.
2). Connect the charge set and a charging cylinder
to the service port of the 3-way valve.
3). Air purging.
Open the valves on the charging cylinder and the
charge set. Purge the air by loosening the flare nut
on the 2-way valve approximately 45' for 3
seconds then closing it for 1 minute; repeat 3
times.
14
the meter does not indicate -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acp-18ch50aeriAcp-24ch70aeriAcp-12ch35aeri gold

Table of Contents

Save PDF