Roberts Gorden Vantage HEM-80 Installation, Operation & Service Manual page 26

Gas-fired, low intensity unitary heater
Table of Contents

Advertisement

HEM-S
I
, O
ERIES
NSTALLATION
PERATION AND
Step 6.4.2 Coupling and Tube Assembly (Continued)
7' 6" ± 1'
(2.3 m ± .25 m)
Step 6.5 Turbulator Installation
Description
Turbulator Adapter
Turbulator Section
Tube
22 of 80
S
M
ERVICE
ANUAL
10' ± 1'
(3 m ± .25 m)
Part Number
03051501
03051502
91409XXX
Total Overall
Tube Length
Install turbulator as specified in
the "Turbulator Installation"
chart below. Turbulator is not
required on the HEM-200.
Tube Length
Model
Minimum
HEM-80
20' (6 m)
HEM-115
30' (9 m)
HEM-150
40' (12 m)
HEM-200
50' (15 m)
Turbulator Installation
HEM-80
2nd 10' Section
HEM-115
3rd 10' Section
HEM-150
4th 10' Section
HEM-200
N/A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vantage hem-115Vantage hem-150Vantage hem-200

Table of Contents