Gas Specs:
QTY.
QTY.
QTY.
QTY.
Before installation and operation of heating equipment, read and understand the
Applications, engineering and detailed guidance on systems design, installation and product performance is available upon request.
ROBERTS GORDON
the installation and service of gas-fired heating equipment.
© Copyright 2001 Roberts-Gordon
The Twin Fire
Unitary Infrared Heater
Submittal: TF-Series
Job:
Location:
Engineer:
Date:
MODEL NO. TF
MODEL NO. TF
MODEL NO. TF
MODEL NO. TF
TOTAL INPUT
Installation, Operation and Service Manual.
®
products are to be installed only in accordance with local laws, codes and regulations, and only by a contractor qualified in
UNIT INPUT
UNIT INPUT
UNIT INPUT
UNIT INPUT
BTU/HR
Important
Roberts-Gordon
1250 William Street
P.O. Box 44
Buffalo, New York 14240-0044
Telephone: 716.852.4400
Fax: 716.852.0854
Toll Free: 800.828.7450
www.rg-inc.com
BTU/HR
BTU/HR
BTU/HR
BTU/HR
Roberts-Gordon Canada Inc.
241 South Service Road West
Grimsby, Ontario L3M 1Y7
Canada
Telephone: 905.945.5403
Fax: 905.945.0511
P/N190600NA
06/01