Arrow Storage Products VAR1012S Owner's Manual & Assembly Manual page 18

Table of Contents

Advertisement

Step 3: Roof Beams
You will need for this page:
(QTY: 16)
Overlap two (2) Roof Beams so that the bottom
1
slots align as shown. Insert six (6) bolts and
nuts as shown below.
2
Insert two (2) bolts and nuts into slots on bottom
of the Beam as shown. Check that the fi nished
length of the Assembly is 142 3/8" (361,6 cm).
Set aside for use in Step 12.
3
Repeat parts 1 & 2 to build a second Roof
Beam Assembly.
Slide parts together until the bottom slots align.
Insert six (6) bolts into holes.
142 3/8" 361,6 cm
Finished Length
4
10397
Roof Beam
Insert bolts into slots from bottom.
18
10397
BUILD TWO (2) BEAMS
18AZ
10397
Six (6) holes align.

Advertisement

Table of Contents
loading

Table of Contents