Advertisement

Quick Links

723490617
Owner's Manual
& Assembly Guide
Gloves must be worn
at all times to reduce
risk of injury!
Customer Service:
1-800-851-1085
assist@arrowsheds.com
BUILDING DIMENSIONS
Approx.
Storage
Size
8' x 2'
17 Sq. Ft. 105 Cu. Ft.
2
2,4 m x 0,6 m
1,6 m
* See Inside for Detailed Safety Information.
or
Size rounded off to the nearest foot
Exterior Dimensions
(Roof Edge to Roof Edge)
Area
Width
Depth
99 3/4"
30 3/4"
3,0 m 3
253,4 cm
78,1 cm
Model No.
Base
Size
Interior Dimensions
(Wall to Wall)
Height
Width
Depth
79 1/8"
94 3/4"
25 1/2"
201,0 cm
240,7 cm
64,8 cm
www.arrowsheds.com
A WR82
VD82
8' x 2'
97 1/2" x 28 1/4"
247,7 cm x 71,8 cm
For proper base construction see page 12
Door
Opening
Height
Width
Height
77 7/8"
43 1/2"
69 1/4"
197,8 cm
110,5 cm
175,9 cm
01CY
Nominal Size

Advertisement

Table of Contents
loading

Summary of Contents for Arrow Storage Products WR82 Series

  • Page 1 01CY 723490617 Owner’s Manual & Assembly Guide www.arrowsheds.com Model No. A WR82 VD82 Gloves must be worn at all times to reduce 8’ x 2’ risk of injury! Nominal Size Customer Service: 1-800-851-1085 Base 97 1/2” x 28 1/4” assist@arrowsheds.com Size 247,7 cm x 71,8 cm BUILDING DIMENSIONS...
  • Page 2 SAFETY PRECAUTIONS... Safety precautions MUST be followed at all times throughout the construction of your building! Practice caution with the tools being used in the Care must be taken when handling various pieces assembly of this building. Be especially familiar with of your building since many contain sharp edges.
  • Page 3: What You Need

    ASSEMBLY TIPS & TOOLS Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building.
  • Page 4: Frequently Asked Questions

    FREQUENTLY ASKED QUESTIONS How long will it take to assemble the building? Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Guidelines for each shed assembly are approximate AFTER completion of the base, and assume two or more people working on the assembly.
  • Page 5 What kind of base do I use? You can: •Use an Arrow Base Kit •Pour a concrete slab •Build a wood deck/fl oor (use exterior-grade plywood) •Use patio blocks •Build on crushed gravel, dirt or grass Arrow provides a base kit accessory that is an option for most building sizes. If you are building a wood deck/fl oor, an Arrow fl...
  • Page 6: Customer Service

    What if the rear wall angle and channels are too large to fi t inside of the rear wall panels? Check the dimensions of wall assemblies. They should be slightly smaller than the fl oor frames. Lay the assemblies on top of the rear fl oor frame and pull them up to the top of the wall panels causing the corner panels to stand erect and not lean inward.
  • Page 7 HARDWARE LIST... 07DT Hardware Views by Key No. Key Part Part Qty. Description List 65103 Hex Nut (#8-32) 65109 Acorn Nut #2 Phillips 11/32 Hex. 5/16 Hex. 65900A Black Screw (#10B x 1/2) (13 mm) 65923 Small Bolt (#8-32 x 3/8) (10 mm) 65004 Small Screw (#8AB x 5/16) (8 mm) 66646...
  • Page 8 PARTS LIST... 08DT Key Part Part Qty. Selected End Views by Key No. Description List 9379 Front Floor Frame 8941 Ramp 8984 Side Floor Frame 9377 Rear Floor Frame 5288 Corner Post 5287 Splice Post 9378 Door Track 6617 Door Track Splice 6637 Side Wall Angle 9336...
  • Page 9 ASSEMBLY BY KEY NO. 09DT...
  • Page 10: Assembly Overview

    ASSEMBLY OVERVIEW 10AE Install Corner Post, Door Track, Side Build the Floor Frame. Wall Angles, and Rear Wall Angle. Install Siding Studs. Install Splice Post and Door Jambs. Install Rear Siding Panels. Install Side Siding Panels.
  • Page 11 ASSEMBLY OVERVIEW 11AE Install Right and Left Gables. Install Front Siding Panels. Install Roof Panels. Install Roof Beams. Install Ridge Cap, Side Trim, and Install Doors Corner Cap. Shed is now complete.
  • Page 12 CONSTRUCTING A BASE... No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.).
  • Page 13 Step 1: Floor Frames 13AE You will need for this page: Washers are to be used on 9379 8941 painted parts only. Washers are not necessary on unpainted parts and there are not enough Front Floor Ramp (QTY: 8) Frame to use on every screw and bolt.
  • Page 14 Step 1: Floor Frames 14DT You will need for this page: 9377 9377 Rear Floor (QTY: 5) Frame Assemble the Rear Floor Frames. Overlap two (2) Rear Floor Frames as shown and secure with fi ve (5) Small Bolts and Nuts. Two (2) Small Bolts must enter from bottom.
  • Page 15 Step 2: Wall Frame 15AE You will need for this page: 9336 9337 Left Rear Right Rear (QTY: 1) Wall Angle Wall Angle Overlap the Right and Left Rear Wall Angles as shown and secure using one (1) Small Bolt and Nut through the center hole.
  • Page 16 Step 3: Main Roof Beam 16AE You will need for this page: 6637 7956 Side Wall (QTY: 4) Roof Beam Angle Place one (1) Side Wall Angle, back-to-back, with one Assembled End View (1) Roof Beam as shown and fasten together using four (4) Small Screws.
  • Page 17: Step 4: Door Track

    Step 4: Door Track 17AE You will need for this page: 6617 9378 66769 9378 (QTY: 4) Track Splice Door Track Door Slide Align two (2) Door Tracks with the four (4) holes in 6617 the bottom of the Door Track Splice and insert four (4) Small Screws.
  • Page 18: Step 5: Frame Assembly

    Step 5: Frame Assembly 18AE You will need for this page: Assemblies from Step 1: 8984 • Front Floor Assembly (1) • Rear Floor Assembly (1) Side Floor (QTY: 8) (QTY: 2) Frame Do NOT fasten your Floor Frames to your Base at this time. You will anchor your building after it is erected.
  • Page 19 Step 6: Posts/Top Frames 19DT You will need for this page: Assemblies from step 2: 5288 6637 • Rear Wall Angle Assembly (1) Assemblies from step 4: Side Wall • Door Track Assembly (1) (QTY: 18) Corner Post Angle Position Corner Posts at the corner of the Floor Frame as shown.
  • Page 20 Step 7: 20AE Splice Post/Door Jamb/ Studs You will need for this page: 5287 9344 7311 (QTY: 4) (QTY: 2) Splice Post Siding Stud Door Jamb (QTY: 4) (QTY: 8) Position Splice Post at the center of the rear wall and fasten to Rear Wall Angle using four (4) Small Bolts and Nuts and two (2) Small Screws to the Floor Frame.
  • Page 21: Step 8: Side Siding

    Step 8: Side Siding 21AE You will need for this page: Washers are to be used on painted parts 8827 only. Washers are not necessary on unpainted parts and there are not enough to use on every Screw and Bolt. Side Siding (QTY: 24) Slide Side Siding into channels of Corner Posts as shown.
  • Page 22 Step 9: Rear Siding 22AE You will need for this page: Washers are to be used on painted parts 9345 only. Washers are not necessary on unpainted parts and there are not enough to use on every Screw and Bolt. Rear Siding (QTY: 14) (QTY: 24)
  • Page 23 Step 10: Front Siding 23AE You will need for this page: 9746 Front Siding (QTY: 24) Slide Front Siding into channels of Corner Posts and Door Jambs as shown. Once in place, secure Panels from inside the building to the Corner Posts and Door Jambs using four (4) Small Screws per Panel.
  • Page 24 Step 11: Gables 24DT You will need for this page: 7907 7906 7916 Roof Beam Left Gable Right Gable Bracket (QTY: 8) GABLES STACKED TOGETHER DURING SHIPPING MISTAKEN FOR ONE GABLE! SEPARATE GABLES BEFORE CONTINUING. Attach a Roof Beam Bracket to all four (4) Gables using two (2) Small Bolts and Nuts for each.
  • Page 25 Step 11: Gables 25DT You will need for this page: 6658 (QTY: 10) (QTY: 4) Gable Brace Working with one (1) Gable at a time, attach Gable must fi t UNDER the Rear Gables to the Rear Wall Angle with Side Wall Angle at corner.
  • Page 26 Step 11: Gables 26DT You will need for this page: 6658 6228 (QTY: 14) (QTY: 3) Gable Brace Track Sup. Working with one Gable at a time, attach the front Gables to the Door Track with ten (10) Small Screws. Do not insert screws into the two (2) holes closest to the peak of each Gable.
  • Page 27 Step 12: Roof Framing 27AE You will need for this page: 7956 Assemblies from Step 3: • Main Roof Beam Assembly (1) (QTY: 12) Roof Beam Position the Roof Beams as shown below and install using two (2) Small Bolts and Nuts per side. Install the Main (center) Beam Assembly fi...
  • Page 28 Roof Install Prep Page 28AE Use the information on this page to complete step 13. Measure the building diagonally again to make sure the building is square. The building should be square at the base and at the top. This will make roof panels fi...
  • Page 29: Step 13: Roof Assembly

    Step 13: Roof Assembly 29DT You will need for this page: 7955 67293 Weather Roof Panel Stripping (QTY: 24) (QTY: 20) Following the diagram on the previous page attach Roof Panel to center roof beam using four (4) Small Screws. Continue installation of Roof Panel using eight (8) Small Screws and ten (10) Small Bolts and Nuts as shown.
  • Page 30 Step 14: 30AE Ridge Cap/Roof Trim You will need for this page: 6868 6014 66183 66183 67468 Left Corner Side Roof Right Corner (QTY: 4) Ridge Cap Trim Peak Cap (QTY: 4) Install Peak Caps and Ridge Cap using four (4) Small Bolts and Nuts as shown.
  • Page 31: Step 15: Door Assembly

    Step 15: Door Assembly 31DT You will need for this page: 10484 6301 Door Vert. Brace (QTY: 3) (QTY: 2) Handle Secure Door Handle to Door with two (2) bolts and nuts. Attach the Door Handle to the Door with two (2) bolts and nuts as shown.
  • Page 32 Step 15: Door Assembly 32DT You will need for this page: 10498 10498 Horiz. Brace (QTY: 6) Door Guide Slide Horizontal Brace over Door edge and secure with one (1) bolt and nut in top and bottom. Secure the Door Guides and Lower Horizontal Door Brace as shown below.
  • Page 33: Door Adjustment

    Step 16: Door Install 33DT You will need for this page: Assemblies from Step 15: • Right Door Assembly (1) • Left Door Assembly (1) (QTY: 8) Gable Door Slide From inside the building, place the bottom of the Door into the Front Floor Frame track at about the half- open position.
  • Page 34 ANCHORING OPTIONS... IMPORTANT: • If you have swing doors, they must hang and swing level before anchoring building. • Anchor your building at this time. See below for details on anchoring. • If you have purchased a Floor Frame Kit, you should install it at this time. •...
  • Page 35 CARE & MAINTENANCE... Exterior Care: For a long lasting fi nish, clean and wax the exterior surface. We recommend washing with a mild soap solution. DO NOT use power washing to clean your shed. Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region.

This manual is also suitable for:

Vd82a

Table of Contents