Installation; Installation Of The Ethernet Cable And Grounding; Silicon Plug Installation (Ensure Seals) - WEG Cassia X1000 Installation And Operation Manual

Table of Contents

Advertisement

Available languages

Available languages

6 INSTALLATION

DANGER!
Risk of electric shock. Do not touch electrically energized parts or devices. Before starting to install the
gateway, disconnect the power supply.
ATTENTION!
Acceptable environmental operating conditions: temperature from -40 °C up to 65 °C (rated conditions).
The gateway installation in the field is simple and does not require the use of advanced tools. The signal range
depends on factors such as physical barriers between the gateway and sensors, signal interference and proper
installation. It is estimated that the signal range in industrial environments can reach 30 meters and in the open
field (without interference or barriers) 50 meters.

6.1 INSTALLATION OF THE ETHERNET CABLE AND GROUNDING

(1) Remove the bottom cover.
(2) Insert the Ethernet cable into the proper port and install the grounding in the marked position.
Reinstall the bottom cover.

6.2 SILICON PLUG INSTALLATION (ENSURE SEALS)

(1)
(1) Install the silicone plug on the Ethernet cable.
(2) Slide the plug into the opening at the bottom base.
(3) Install the 3 plugs into the bottom holes.
(1)
Figure 6.1: Installation of the Ethernet cable and grounding
(2)
Figure 6.2: Silicon plug installation (ensure seals)
(2)
(3)
Gateway Cassia X1000| 19
Installation

Advertisement

Table of Contents
loading

Table of Contents