ABSCO SHEDS RG37601N2 Manual page 23

Table of Contents

Advertisement

Guttering + Downpipe
Join lengths of gutter TR22, to match the length
of the shed by notching the roller edge of one to
allow the other to slide into it.
Put silicone in the joint and then use rivets,
FAST009, to fasten the sections together.
Repeat this for the other side.
Mark the rectangular cutout to suit the downpipe
drop RWG18 at the end you select.
Remove material and fix RWG18 with silicone and
rivets.
Mark a line 110mm down from the top of the outer
purlins at either end of the shed. Run a stringline
between these marks. This is a reference to align
the bottom position of the gutter brackets, RWG06.
RWG06 are to be fixed to the sheeting rib at either
end and spaced equally along the shed length.
You may wish to allow for a slight fall to the
downpipe position.
Fix gutter onto brackets equally at both ends, push
top of bracket into outer roll of gutter and bend
small support arm down to hold the inner face.
Rivet the brackets to the gutter through the bottom
of each bracket.
Fit downpipes to drops with silicone and rivets.
Secure to wall sheeting with downpipe strap bent
to suit.
Barge Capping and Trim
Fit barge capping (TR06) to the front and rear
gables, fixing where there is a purlin beneath it.
Fit TR21 between sheet and frame directly above
roller door. Two lengths will be required.
Measure and cut TR19 to suit either side of roller
door opening, covering the raw edge of 237-1.
Roller Door Installation
These instructions and components are located
with the roller door.
• FAST081 are to be used to fix roller door
guides.
Absco Industries
Assembly Instruction Manual
ABSCO GARAGE
MODEL: RG37601N2
3.7m W x 6.0m D x 3.2m H
Model: RG37601N2
TR25
RWG06
TR21
31/08/20
RWG18
TR22
Cutout for downpipe
drop at back edge of
gutter.
Bend down the two arms
of the bracket over the
back edge of the gutter.
TR22
TR06
TR19
23

Advertisement

Table of Contents
loading

Table of Contents