Controls Installation - Efco Swaploader SL-406 Parts And Operation Manual

Table of Contents

Advertisement

1.
Attach the valve mount bracket (Pt. No. 41H01) to the mainframe as indicated on Dwg.
No. 90H57 with the fasteners provided (See Drawing 43H31).
2.
Mount the hydraulic control valve assembly (Pt. No. 20P88) to the valve mount bracket
as shown on Drawing No. 90H57 with the fasteners provided.
3.
Install the hydraulic adapters, connect the hydraulic tubing (Pt. No. 13P11), and connect
the hydraulic hose assemblies (Pt. Nos. 11P98 and 11P99) to the control valve assembly
as indicated on Drawing No. 91H13. The clamp assemblies that are provided in the
Loose Parts Box should support the tubing (See Drawing 43H31).
4.
Determine the best location in the cab for the control levers (Pt. No. 20P08). The
location should be such that the controls can be easily reached while operating the truck.
A control lever console (Pt. No. 20P09) is provided to facilitate the mounting of the
control levers.
5.
Assemble and install the control lever console (See diagram below). Typically the
console is fastened to the floor of the cab and the control cables are routed through
additional holes drilled in the floor. Your particular installation may require that
additional brackets be fabricated or other modifications made.
SL-406.INS
09/2009
CONTROLS INSTALLATION - MANUAL
2-7

Advertisement

Table of Contents
loading

Table of Contents