Efco Swaploader SL-406 Parts And Operation Manual page 87

Table of Contents

Advertisement

Adjustment Screw
Valve Ramp
Side
View
Pivot Joint
(Ref)
ADJUSTMENT
Should the jib lockout valve need adjustment the first step will be to loosen the mount bracket
screws (see illustration above). Reposition the jib lockout valve with respect to the valve ramp
by turning the adjustment screw on the valve mount bracket as follows:
Clockwise Adjustment – Moves the jib lockout valve closer to the valve ramp
Counter-Clockwise Adjustment – Moves the jib lockout valve away from the valve ramp
Once the valve has been moved back into proper adjustment, then tighten up the mount bracket
screws.
PART NUMBER & SPECIFICATION
SwapLoader
Work Port Size
Pt. No.
21P28
3/4-16 ORB (SAE 8)
Please contact your SwapLoader Distributor or SwapLoader USA should you have any
questions regarding this procedure.
SL-406.MAI
06/2009
Mainframe
(Ref)
Valve Mount
Valve Mount
Jib Lockout
Side
View
Mount Bracket
Screw (2-Typ)
TOP VIEW
JIB LOCKOUT VALVE ADJUSTMENT ILLUSTRATION
Spool Type
2-Way, 2-Position N.C.
Valve Ramp
Base
Mainframe
(Ref)
Bracket
Valve
Mount Bracket
Screw (2-Typ)
Pressure
(Maximum)
4,600 PSI (Nominal)
1/8" to 3/16" of
Roller Exposed
Valve
Valve Mount
Bracket
SIDE VIEW
Flow Rate
(Maximum)
16 GPM (Nominal)
4-10

Advertisement

Table of Contents
loading

Table of Contents