Advertisement

PHP A-4, 6, 8 & 9
Supplement to Instruction manual
PHP A-1 4.0 & 5.6
UK version, original instructions

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PHP A-4 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Grundfos PHP A-4

  • Page 1 PHP A-4, 6, 8 & 9 Supplement to Instruction manual PHP A-1 4.0 & 5.6 UK version, original instructions...
  • Page 2: Table Of Contents

    PHP A-4, 6, 8 & 9 Instruction Manual / Contents Table of Contents 1. General 2. Mounting Installing the device Degassing module PHP EMAE-1, makeup module PHP EMCF-1 V 3. Hydraulic diagrams 4. Wiring diagrams 5. Commissioning 6. Technical data 7.
  • Page 3: General

    PHP A-4, 6, 8 & 9 Instruction Manual / General General 1.1 Tender text All operations are controlled by the microprocessor electronics. The operator panel is situated ergonomically and contains an illuminated 4-line text display. The handling is thought-out and PHP for lossless storage of the expansion volume and for a lot of languages are supported.
  • Page 4: Mounting

    PHP A-4, 6, 8 & 9 Instruction Manual / Mounting Mounting 2.1 Installing the device 2.2 Degassing module PHP EMAE-1, makeup module PHP EMCF-1 V (Model EMCF-1 V included when The PHP device must be installed on a horizontal and solid break tank fitted).
  • Page 5: Hydraulic Diagrams

    PHP A-4, 6, 8 & 9 Instruction Manual / Hydraulic diagrams Hydraulic diagrams PHP modular with degassing: Options: Second main vessel, additional vessels, expansion modules, degassing module EMAE, makeup module EMCF-1 V, sensor T2. 1. Makeup water 4. Discharge hopper for vessel safety valve 5.
  • Page 6 PHP A-4, 6, 8 & 9 Instruction Manual / Hydraulic diagrams PHP modular without degassing: Options: Second main vessel, additional vessels, expansion modules, makeup module EMCF-1 V, sensor T2. 1. Makeup water 4. Discharge hopper for vessel safety valve 5. Suction pipe from expansion vessel 6.
  • Page 7 PHP A-4, 6, 8 & 9 Instruction Manual / Hydraulic diagrams PHP modular without degassing with cooling vessel: Options: Second main vessel, additional vessels, expansion modules, makeup module EMCF-1 V, water treatment, sensor T2, cooling vessel EV. 1. Makeup water 4.
  • Page 8: Wiring Diagrams

    PHP A-4, 6, 8 & 9 Instruction Manual / Wiring diagrams Wiring diagrams...
  • Page 9 PHP A-4, 6, 8 & 9 Instruction Manual / Wiring diagrams...
  • Page 10 PHP A-4, 6, 8 & 9 Instruction Manual / Wiring diagrams...
  • Page 11 PHP A-4, 6, 8 & 9 Instruction Manual / Wiring diagrams 4.2 Break Tank wiring 1 mm² 1 mm² 1 mm² 1 mm² 1 mm² 1 mm² MCB N/O Aux opens on Trip MCB N/O Aux opens on Trip AUX2 / 5.10...
  • Page 12 PHP A-4, 6, 8 & 9 Instruction Manual / Wiring diagrams Legend PHP A-4, A-6, A-8, A-9 Marketing Description Control-electronics: PHP basic circuit board, type 200331 Control-electronics: PHP central processing board, type ABCO10 Makeup module: magnetic valve (OPTION) Makeup module: water meter: pulse output (OPTION)
  • Page 13 PHP A-4, 6, 8 & 9 Instruction Manual / Commissioning PHP A-4, 6, 8 & 9 Commissioning PHP A-4, 6, 8 & 9 STEP 5 Open the makeup water connection to EMCF-1 V makeup module and set the pressure reducing valve to 1,5 bar - max.
  • Page 14 PHP A-4, 6, 8 & 9 Instruction Manual / Commissioning PHP A-4, 6, 8 & 9 STEP 7 INFORMATION Fill and ventilate the pressure maintenance pump(s) and Shut off all expansion vessels except the first vessel the piping. previously to ¬...
  • Page 15 PHP A-4, 6, 8 & 9 Instruction Manual / Commissioning PHP A-4, 6, 8 & 9 STEP 8 User level 3 Configuration of the PHP device .))) device set-up /))) vessel code • Press key “F2” (operate) in main display *.))) acc.
  • Page 16: Commissioning

    PHP A-4, 6, 8 & 9 Instruction Manual / Commissioning PHP A-4, 6, 8 & 9 • Select “settings” “pressure maintenance” “working STEP 9 Enable the device by pressing the key “I” in main display and pressure” confirm it by pressing the key ”F1” (Yes) (green control lamp •...
  • Page 17 PHP A-4, 6, 8 & 9 Instruction Manual / Commissioning PHP A-4, 6, 8 & 9 • After this, the output ”degassing valve” must be set STEP 12 If a EMCF-1 V makeup module is installed, the operating to ”Auto” again.
  • Page 18 PHP A-4, 6, 8 & 9 Instruction Manual / Commissioning PHP A-4, 6, 8 & 9 5.2 Commissioning the make-up 5.3 Commissioning the make up water BREAK TANK water PUMPS 1. Connect the ½” BSP Male MAINS WATER IN connection 1.
  • Page 19: Technical Data

    PHP A-4, 6, 8 & 9 Instruction Manual / Technical data Technical data PHP Range type Spirotech internal art. no. max. upper working pressure °C V/Hz voltage max. electrical power 1x 230 V 3x 400 V fuse protection 50 Hz 50 Hz Rp1/2 bzw.
  • Page 20 PHP A-4, 6, 8 & 9 Instruction Manual / Technical data...
  • Page 21: Spare Parts List

    PHP A-4, 6, 8 & 9 Instruction Manual / Spare parts list Spare parts list Grundfos Spirotech Grundfos Description PHP Spare Parts SAP Code internal code 99478305 Spare, PHP Pressure Transmitter Pressure Transmitter: 90140 99478306 Spare, PHP Inlet water solenoid...
  • Page 22: Appendix

    PHP A-4, 6, 8 & 9 Instruction Manual / Appendix Appendix APPENDIX A - HYDRAULIC CONNECTION BETWEEN 2. Installation of the suction pipe PHP AND EXPANSION VESSEL) Sometimes it is necessary to cross the overflow pipe and the suction pipe to connect PHP and expansion PHP series devices don‘t have a built-on vessel.
  • Page 23 PHP A-4, 6, 8 & 9 Instruction Manual / Appendix Suction pipe overflow pipe...
  • Page 24: Ec Declaration Of Conformity

    PHP A-4, 6, 8 & 9 Instruction Manual / EC declaration of Conformity EC declaration of Conformity...
  • Page 25 GRUNDFOS PUMPS LTD Grovebury Road, Leighton Buzzard, Bedfordshire LU7 4TL T: 01525 850 000 E: grundfos-uk@sales.grundfos.com...

This manual is also suitable for:

Php a-6Php a-8Php a-9

Table of Contents