Evm description

Advertisement

Quick Links

The AFE722x EVM includes a great level of flexibility to enable the user to test it in a more system like
environment. The individual power rails can be generated through LDOs or DC/DC converters from a 6 V
power source and the EVM clock architecture allows for external clock input as well as clock generation
using a low jitter PLL in combination with a VCXO. On the transmit side the EVM provides the option of
connecting directly to the DAC outputs or perform up-conversion via on board IQ modulator.
On the digital side the EVM provides a seamless interface to the TSW1200 capture card in order to
evaluate received data directly on a PC. The TSW3100 pattern generation card can be used to provide
data to the dual DAC of the AFE722x and the on board CDCE72010 generates the appropriate clock for
the TSW3100 for synchronous operation. Both AFE722x and CDCE72010 can be programmed via SPI
conveniently through the USB connection.
IQ Modulator
Output
DAC Outputs
for ChA and ChB
TSW3100
AUX ADC and
DAC
SLOU330 – December 2011
Submit Documentation Feedback
LO Input
Clock
Inputs
TSW1200
Copyright © 2011, Texas Instruments Incorporated
User's Guide
SLOU330 – December 2011
EVM Description
6V Power
Input
Power Supply Jumpers
for LDO/DCDC, iQ Mod
and CDCE72010
ADC Input for
ChA and ChB
USB
EVM Description
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AFE7222EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments AFE7222EVM

  • Page 1 ChA and ChB 6V Power Input Power Supply Jumpers for LDO/DCDC, iQ Mod and CDCE72010 TSW3100 ADC Input for ChA and ChB AUX ADC and TSW1200 SLOU330 – December 2011 EVM Description Submit Documentation Feedback Copyright © 2011, Texas Instruments Incorporated...
  • Page 2: Table Of Contents

    2. Run Setup.exe 3. Follow the on-screen instructions 4. Once installed, launch by clicking on the AFE722x_GUI_vxpx program in Start >Texas Instruments ADCs. 5. When plugging in the USB cable for the first time, the user will be prompted to install the USB drivers for ‘USB Serial Converter’...
  • Page 3: Afe722X.ini File For Tsw1200

    & 8bit data in hex format as well as 8bit in binary format. The EVM software also provides the option to save all registers to a file or to load registers from a file. SLOU330 – December 2011 EVM Description Submit Documentation Feedback Copyright © 2011, Texas Instruments Incorporated...
  • Page 4: Initial Evm Setup And Basic Test Procedure

    TSW.txt’) to the CDCE72010, it then sets the dividers so that a /3 copy of the input clock is routed to the AFE722x clock input and a /4 copy to the TSW3100. CDCE72010 122.88MHz AFE722x 368.64MHz AUX IN 92.16MHz TSW3100 SLOU330 – December 2011 EVM Description Submit Documentation Feedback Copyright © 2011, Texas Instruments Incorporated...
  • Page 5: Rx Path Using Tsw1200

    In the TSW1200 software, the AFE722x should be selected as the ADC. Next the sampling rate and ADC input frequency need to be entered and the TSW1200 software will calculate the coherent frequency. Performing a capture should yield: Fs=122.88Msps Fin= 9.98625MHz SLOU330 – December 2011 EVM Description Submit Documentation Feedback Copyright © 2011, Texas Instruments Incorporated...
  • Page 6: Tx Path Using Tsw3100

    DCLK Data The table below shows clock delays for listed DAC sampling rates that showed proper operation. SLOU330 – December 2011 EVM Description Submit Documentation Feedback Copyright © 2011, Texas Instruments Incorporated...
  • Page 7: Clock Delays For Listed Dac Sampling Rates

    1. Install Matlab runtime engine (MCRInstaller.exe) 2. Open one of the executable (.exe) TSW3100 GUIs – ‘TSW3100_MultitonePattern_v2p7.exe 3. Enter DAC sampling rate 4. Enter tone frequencies SLOU330 – December 2011 EVM Description Submit Documentation Feedback Copyright © 2011, Texas Instruments Incorporated...
  • Page 8 Run’ option The DAC output should show something like this on the spectrum analyzer (example with sample rate = 122.88 MSPS, input tone = 10 MHz). SLOU330 – December 2011 EVM Description Submit Documentation Feedback Copyright © 2011, Texas Instruments Incorporated...
  • Page 9: Power Supply Options

    LVDS interface, the DAC data rate is 6x the actual AFE722x clock frequency. Hence the clock to the TSW3100 needs to 6/8 = 3/4x the AFE722x clock frequency. SLOU330 – December 2011 EVM Description Submit Documentation Feedback Copyright © 2011, Texas Instruments Incorporated...
  • Page 10: Non-Vcxo Option (Default)

    VCXO. AUX IN This setup is useful for testing the AFE722x at clock frequencies where a VCXO is not immediately available. TSW3100 SLOU330 – December 2011 EVM Description Submit Documentation Feedback Copyright © 2011, Texas Instruments Incorporated...
  • Page 11: System Level

    For example interpolation by 2x in the DAC requires that the data coming from the TSW3100 arrives TSW3100 at ½ of the AFE722x clock frequency. SLOU330 – December 2011 EVM Description Submit Documentation Feedback Copyright © 2011, Texas Instruments Incorporated...
  • Page 12: Decimation On The Adc

    Furthermore RX decimation settings features such as decimation and loopback as well as TX RX loopback mode are controlled here as well. SLOU330 – December 2011 EVM Description Submit Documentation Feedback Copyright © 2011, Texas Instruments Incorporated...
  • Page 13: Tx Setup

    When using the IQ modulator, there is a separate SMA connector on the EVM for the LO input. Also there is a low pass filter between DAC and IQ modulator for image suppression with a default cut off frequency of 125 MHz. SLOU330 – December 2011 EVM Description Submit Documentation Feedback Copyright © 2011, Texas Instruments Incorporated...
  • Page 14 Serial LVDS 2 Wire Data Orientation MSB First Format 2s Complement Clock Delay Enabled Clock Delay 300ps Frame Clock Delay Disabled Frame Clock Delay Disabled SLOU330 – December 2011 EVM Description Submit Documentation Feedback Copyright © 2011, Texas Instruments Incorporated...
  • Page 15: Trouble Shooting Of The Evm Setup

    IP address conflict between the PC and the TSW3100. The following steps should provide a solution for that problem. TSW3100 IP Configuration SLOU330 – December 2011 EVM Description Submit Documentation Feedback Copyright © 2011, Texas Instruments Incorporated...
  • Page 16 1. Ensure that the SW2 dip switches are all set to open (open side down). This will set the TSW3100 to be IP address 192.168.1.123 SLOU330 – December 2011 EVM Description Submit Documentation Feedback Copyright © 2011, Texas Instruments Incorporated...
  • Page 17: Ip Address Digit Selection Using Sw2

    Ping 192.168.1.123 and watch for 0% packet loss. 3. If both address response, then TSW3100 works. TSW3100 version check: telnet 192.168.1.123 cd etc more version SLOU330 – December 2011 EVM Description Submit Documentation Feedback Copyright © 2011, Texas Instruments Incorporated...
  • Page 18 Any exceptions to this are strictly prohibited and unauthorized by Texas Instruments unless user has obtained appropriate experimental/development licenses from local regulatory authorities, which is responsibility of user including its acceptable authorization.
  • Page 19 FCC Interference Statement for Class B EVM devices This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications.
  • Page 20 Also, please do not transfer this product, unless you give the same notice above to the transferee. Please note that if you could not follow the instructions above, you will be subject to penalties of Radio Law of Japan. Texas Instruments Japan Limited (address) 24-1, Nishi-Shinjuku 6 chome, Shinjuku-ku, Tokyo, Japan http://www.tij.co.jp...
  • Page 21 FDA Class III or similar classification, then you must specifically notify TI of such intent and enter into a separate Assurance and Indemnity Agreement. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2012, Texas Instruments Incorporated...
  • Page 22 IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, enhancements, improvements and other changes to its semiconductor products and services per JESD46, latest issue, and to discontinue any product or service per JESD48, latest issue.
  • Page 23 Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments AFE7222EVM...

Table of Contents