Advertisement

Quick Links

This user's guide describes the characteristics, operation, and use of the DRV5011-5012EVM evaluation
module (EVM). This EVM is designed to evaluate the performance of the
low power digital-latch Hall effect sensors. Throughout this document, the terms evaluation board,
evaluation module, and EVM are synonymous with the DRV5011-5012EVM. This document includes a
schematic, reference printed-circuit board (PCB) layouts, and a complete bill of materials.
SLYU045A – December 2017 – Revised November 2019
Submit Documentation Feedback
Copyright © 2017–2019, Texas Instruments Incorporated
SLYU045A – December 2017 – Revised November 2019
DRV5011-5012EVM
DRV5011
User's Guide
and
DRV5012
ultra-
1
DRV5011-5012EVM

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DRV5011-5012EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments DRV5011-5012EVM

  • Page 1 User's Guide SLYU045A – December 2017 – Revised November 2019 DRV5011-5012EVM This user’s guide describes the characteristics, operation, and use of the DRV5011-5012EVM evaluation module (EVM). This EVM is designed to evaluate the performance of the DRV5011 DRV5012 ultra- low power digital-latch Hall effect sensors. Throughout this document, the terms evaluation board, evaluation module, and EVM are synonymous with the DRV5011-5012EVM.
  • Page 2: Table Of Contents

    List of Tables ..................DRV5011-5012EVM Kit Contents ..................... Related Documentation ......................Bill of Materials Trademarks All trademarks are the property of their respective owners. DRV5011-5012EVM SLYU045A – December 2017 – Revised November 2019 Submit Documentation Feedback Copyright © 2017–2019, Texas Instruments Incorporated...
  • Page 3: Overview

    The following document provides information regarding Texas Instruments' integrated circuits used in the assembly of the DRV5011-5012EVM. This user's guide is available from the TI web site under literature number SLYU045. Any letter appended to the literature number corresponds to the document revision that is current at the time of the writing of this document.
  • Page 4: Hardware

    Step 3. Observe the LED turn on and off as the polarity of the magnet reverses. Measurements With the DRV5011-5012EVM, the user can either quickly test the functionality of a DRV5011 circuit with a 5-V USB power supply, or remove and install up to three DRV5011 and DRV5012 devices on coupon boards into a prototype system.
  • Page 5: Evm Components

    R3 is a current-setting resistor that provides the appropriate amount of current to light LED D1 and not damage U7. J1 is the micro-USB connector installed on the DRV5011-5012EVM that allows a USB power source to provide power to U7 and D1.
  • Page 6: Schematic, Pcb Layout, And Bom

    Schematic, PCB Layout, and BOM NOTE: Board layouts are not to scale. These figures are intended to show how the board is laid out. The figures are not intended to be used for manufacturing DRV5011-5012EVM PCBs. Schematic Figure 1...
  • Page 7: Pcb Layout

    Schematic, PCB Layout, and BOM www.ti.com PCB Layout Figure 4 through Figure 9 illustrate the PCB layout for the DRV5011-5012EVM. Figure 5. Top Layer Figure 4. Top Overlay SLYU045A – December 2017 – Revised November 2019 DRV5011-5012EVM Submit Documentation Feedback...
  • Page 8: Bottom Layer

    Schematic, PCB Layout, and BOM www.ti.com Figure 6. Bottom Layer Figure 7. Bottom Overlay DRV5011-5012EVM SLYU045A – December 2017 – Revised November 2019 Submit Documentation Feedback Copyright © 2017–2019, Texas Instruments Incorporated...
  • Page 9: Drill Drawing

    Schematic, PCB Layout, and BOM www.ti.com Figure 9. Dimensions Figure 8. Drill Drawing SLYU045A – December 2017 – Revised November 2019 DRV5011-5012EVM Submit Documentation Feedback Copyright © 2017–2019, Texas Instruments Incorporated...
  • Page 10: Bill Of Materials

    Schematic, PCB Layout, and BOM www.ti.com Bill of Materials Table 3 provides the parts list for the DRV5011-5012EVM. Table 3. Bill of Materials Package Designator Value Description PartNumber Manufacturer Reference CAP, CERM, 0.1 µF, 6.3 V, C0603X5R1C104K0 C1-C7 0.1 µF...
  • Page 11 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 12 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 13 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 14 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 15 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 16 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...

Table of Contents