Zanussi ZGL 63 IT User Information page 36

Table of Contents

Advertisement

Available languages

Available languages

appliance ensure that the installation has
the correct voltage for the appliance. At
full capacity, the drop in pressure must
not exceed 5%. Such a drop in pressure
is caused by the following parameters:
- maximum capacity of meter;
- diameter and lenght of the tube in
front and behind the meter;
- section of transit of variuos tubes
positioned on the circuit;
- diameter of eventual connections.
To ensure a correct operation, a
saving of energy and the long-life of the
appliance, the voltage pressure of the
appliance must correspond to the
recommended values.
The adjustable connection is fixed to
the comprehensive ramp by means of a
threaded nut G 1/2". All the components
shown in the figure have already been
assembled in the factory.
The appliance, before leaving the
factory, has been tested in order to give
you the best results.
Important
When the final connection has been
made, it is essential that a thorough leak
test is carried out on the hob and
installation. Use some soapy water,
never a flame.
36
A) Ramp with ending nut
B) Seal
C) Adjustable connection

Advertisement

Chapters

Table of Contents
loading

Table of Contents