2.8 Estimated Service Time

The estimated service time for this procedure is about 1 hour.

2.9 Required Tools

Service card (shipped in the Power 775 frame)
Lift Tool Kit 74Y1087
Ladder PN 46G5947 may be required for upper DE locations (shipped in the Power 775 Lift Tool Kit)
Hand Tool Kit P/N 74Y0988
Torque Clutch P/N 74Y0985 (shipped in the Hand Tool Kit)
Ratchet handle P/N 6428240 (shipped in the Hand Tool Kit)
Extension (18") P/N 46K2707 (shipped in the Hand Tool Kit)
2 mm Hex Torque Driver P/N 74Y0983 (shipped in the Hand Tool Kit)
3 mm Hex Torque Driver P/N 74Y0998 (shipped in the Hand Tool Kit)
4mm Hex Torque Driver PN 41V1059 (shipped in the Hand Tool Kit)
5 mm Hex tool P/N 74Y0986 (shipped in the Hand Tool Kit)
10 mm Socket P/N 02F3582 (shipped in the Hand Tool Kit)
2.10

Prerequisites for this Procedure

In order to perform this procedure, you will need the following information:
The location code of the DE where the Rails are to be serviced.
The cage location of the DE where the Rails are to be serviced.
The frame number and frame serial number of the Rack containing the DE where the Rails are to be serviced.

2.11 Service Procedure Overview

This is an overview of the tasks to be performed. Read this overview but do not perform any of the tasks yet.
3.1
A
S
SSESS
HUTDOWN OF
3.2
S
D
HUT
OWN THE
3.3
I
DENTIFY THE FRAME
3.4
P
D
OWER OFF THE
3.5
C
350V
ONFIRM THAT
3.6
R
F
D
EMOVE
RONT
3.7
D
C
ISCONNECT
ABLES
3.8
A
L
TTACH THE
IFT
3.9
M
D
E
OVE THE
ISK
3.10
R
EMOVE DEFECTIVE
3.11
I
DE R
NSTALL NEW
3.12
I
DE
NSTALL
BACK INTO FRAME
3.13
S
TORE ALL TOOLS
3.14
P
D
OWER ON THE
3.15
C
ONFIRM WITH THE CUSTOMER
Power775 Disk Enclosure Rail Service Procedure
F
S
<= CUSTOMER TASK
ILE
YSTEM
F
S
<= CUSTOMER TASK
ILE
YSTEM
<= SSR TASK
............................................................................................................... 15
E
<= CUSTOMER TASK
ISK
NCLOSURE
D
E
IS OFF TO THE
ISK
L
P
, M
OOR AND
ATCH
LATE
, H
,
R
OSES
AND
ETENTION
T
<= SSR TASK
OOL TO THE FRAME
L
NCLOSURE ONTO THE
IFT
DE R
<= SSR T
AILS
ASK
<= SSR T
............................................................................................................ 48
AILS
ASK
<= SSR T
ASK
. <= SSR TASK
................................................................................................................... 52
E
<= CUSTOMER TASK
ISK
NCLOSURE
<= SSR T
ASK
......................................................................... 14
.................................................................................. 14
............................................................................. 22
<= SSR TASK
NCLOSURE
UEPO P
<= SSR
OVE
ANEL
S
<= SSR
TASK.......................................................... 29
CREWS
................................................................................... 36
T
<= SSR
TASK.................................................................. 41
OOL
.................................................................................................. 47
................................................................................................. 50
.............................................................................. 52
................................................................................................. 53
13 of 57
............................................................. 22
TASK............................................. 24

Advertisement

Table of Contents
loading

Table of Contents