IBM Power775 Service Procedure page 39

Disk enclosure rails service procedure
Hide thumbs Also See for Power775:
Table of Contents

Advertisement

Power775 Disk Enclosure Rail Service Procedure
STEP 34
Ensure that the UEPO will not be hit as the table moves up and down. Also ensure that the UEPO is secured to the
frame so it does not move during the service procedure.
STEP 35
Raise the lift tool table just below the DE to be removed. The platform is raised via the Table Lift Drive, using the
battery powered drill shipped with the Lift Tool.
ATTENTION:
Use two hands to operate the battery powered drill as it is a high torque tool (see Figure 35).
Use the "Drill" setting on speed "LOW (1)" (Figure 36).
Be aware that when lowering the tool, as you approach the bottom of the lift table range, reduce the
speed of the drill to avoid high torque to the hands and drill slippage from the tool.
Required Tools:
Milwaukee Cordless Drill 2602-20 & Milwaukee 18V Lithium-ION Battery 48-11-1828
Figure 34: Secure Cables
Figure 35 Power Drill Operation – Correct Technique
39 of 57

Advertisement

Table of Contents
loading

Table of Contents