Ultraviolet Lights Installation; Equipment Summary; Airflow Verification Check - Carrier Infinity SYSTXCCITC01-C Installation Instructions Manual

Hide thumbs Also See for Infinity SYSTXCCITC01-C:
Table of Contents

Advertisement

5.9. Ultraviolet Lights Installation

Next, the installer will be prompted to select whether ultraviolet lights
are installed in the system. Select YES or NO, then touch NEXT.

5.10. Equipment Summary

The equipment summary screen will appear after accessories have been
selected. This screen will give a summary of all equipment automatically
found or manually selected. If an incorrect selection was made, touch
RE-INSTALL to restart the installation process. See the Infinity System
HVAC equipment Installation Instructions for more details, as provided.
Example: SPP Equipment Summary Screen
A13120

5.11. Airflow Verification Check

The airflow verification check screen will appear next, as the system
performs this operation. This process will take about 1-1/2 minutes to
complete. When completed, a screen will appear displaying the results of
the check.
If the system has an indoor unit equipped with a previous-version
CFM-controlled blower system the screen will display the static pressure
(in inches of water) across the equipment at the expected highest
delivered airflow. If the blower RPM is greater than 1200, a warning will
appear, but equipment operation and the TrueSense™ dirty filter
26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents