2. Removing the pallet.
The unit is fixed onto the packing pallet with M8 × 20 and M8 × 80 screws, as shown in Figure 2-5. You can use
17mm open-end spanner, ratchet spanner or sleeve to remove the screws.

2.4.3 Inspection

After unpacking the product, check against the packing list that the fittings are complete and that the components are
intact. If any parts are found missing or damaged, please report to the carrier immediately. If any covert defects are
found, please report to the carrier and the local office of the distributor.
Figure 2-5 Screws on pallet
Liebert.CRV+ Series Air Cooled Precision Air Conditioner User Manual
Chapter 2 Instruction For Pre-installation
Screw GB9074_13-88_M8
Hexagon head bolt
GB/T 5782-2000_M8
7
20
×
80
×