Finishing The Indoor Unit Installation; To Insulate The Drain Piping, Refrigerant Piping And Interconnection Cable; To Pass The Pipes Through The Wall Hole - Daikin FTXTP25M5V1B Installer's Reference Manual

Hide thumbs Also See for FTXTP25M5V1B:
Table of Contents

Advertisement

9
|

Finishing the indoor unit installation

9 Finishing the indoor unit installation
9.1 To insulate the drain piping, refrigerant piping and interconnection
cable

9.2 To pass the pipes through the wall hole

Installer reference guide
40
1 After the drain piping, refrigerant piping and the electrical wiring are finished.
Wrap refrigerant pipes, interconnection cable and drain hose together using
insulation tape. Overlap at least half the width of the tape with each turn.
a
b
f
a Drain hose
b Interconnection cable
c Mounting plate (accessory)
d Refrigerant piping
e Indoor unit fixing screw M4×12L (accessory)
f Bottom frame
1 Shape the refrigerant pipes along the pipe path marking on the mounting
plate.
a
b
c
a Drain hose
b Caulk this hole with putty or caulking material
c Adhesive vinyl tape
d Insulation tape
e Mounting plate (accessory)
NOTICE
Do NOT bend refrigerant pipes.
Do NOT push the refrigerant pipes onto the bottom frame or the front grille.
c
d
e
c
d
e
FTXTP25+35M5V1B_ATXTP25+35M5V1B
Daikin room air conditioner
4P519439-13N – 2021.03

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ftxtp35m5v1bAtxtp25m5v1bAtxtp35m5v1b

Table of Contents