To connect the electrical wiring to the indoor unit ..... Daikin website (publicly accessible). 8 Finishing the indoor unit installation ▪ The full set of latest technical data is available on the Daikin To insulate the drain piping, refrigerant piping and Business Portal (authentication required).
A phase advancing capacitor will reduce performance and may About the unit cause accidents. WARNING: MILDLY FLAMMABLE MATERIAL The refrigerant inside this unit is mildly flammable. FTXTM30+40R2V1B Installation manual Daikin room air conditioner 3P482320-13U – 2021.03...
5.1.1 Installation site requirements of the indoor unit INFORMATION ▪ Daikin Industries Czech Republic s.r.o. declares that INFORMATION the radio equipment type inside of this unit is in The sound pressure level is less than 70 dBA. compliance with Directive 2014/53/EU.
To connect the piping on right-side, right-bottom, left-side or left-bottom, the pipe port cover MUST be removed. 1 Cut off the pipe port cover from inside the front grille using a coping saw. FTXTM30+40R2V1B Installation manual Daikin room air conditioner 3P482320-13U – 2021.03...
2 Remove the drain plug on the left side and attach it to the right NOTICE side. The piping and other pressure-containing parts shall be suitable for refrigerant. Use phosphoric acid deoxidised seamless copper for refrigerant. Installation manual FTXTM30+40R2V1B Daikin room air conditioner 3P482320-13U – 2021.03...
1 Connect refrigerant piping to the unit using flare connections. (indoor↔outdoor) 1.5 mm²~2.5 mm² 2 Insulate the refrigerant piping, interconnection cable and drain and applicable for hose on the indoor unit as follows: 220~240 V H05RN-F (60245 IEC 57) FTXTM30+40R2V1B Installation manual Daikin room air conditioner 3P482320-13U – 2021.03...
7 Connect the earth wire to the corresponding terminal. 8 Firmly fix the wires with the terminal screws. 9 Pull the wires to make sure that they are securely attached, then retain the wires with the wire retainer. Installation manual FTXTM30+40R2V1B Daikin room air conditioner 3P482320-13U – 2021.03...
Next commissioning instructions in this chapter, a general To set a different address commissioning checklist is also available on the Daikin Business Portal (authentication required). The general commissioning checklist is complementary to In case 2 indoor units are installed in 1 room, different addresses for the instructions in this chapter and can be used as a 2 user interfaces can be set.
Daikin website (publicly accessible). The fuses or locally installed protection devices are ▪ The full set of latest technical data is available on the Daikin installed according to this document, and have NOT been Business Portal (authentication required).