To insulate the drain piping, refrigerant piping and interconnection cable..............41 To pass the pipes through the wall hole ........................41 To fix the unit on the mounting plate ..........................42 Closing the unit ................................42 Installer reference guide FTXTP-M_FTXTP-N Daikin room air conditioner 4P728168-4 – 2023.03...
Page 3
To perform a test run in winter season ......................50 13 Hand-over to the user 14 Disposal 15 Technical data 15.1 Wiring diagram................................53 15.1.1 Unified wiring diagram legend ........................53 16 Glossary FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
WARNING Make sure installation, servicing, maintenance, repair and applied materials follow the instructions from Daikin (including all documents listed in “Documentation set”) and, in addition, comply with applicable legislation and are performed by qualified persons only. In Europe and areas where IEC standards apply, EN/IEC 60335-2-40 is the applicable standard.
About the documentation Technical engineering data ▪ A subset of the latest technical data is available on the regional Daikin website (publicly accessible). ▪ The full set of latest technical data is available on the Daikin Business Portal (authentication required).
Page 6
Example: " 1–3 Figure title" means "Figure 3 in chapter 1". Indicates a table title or a reference to it. Example: " 1–3 Table title" means "Table 3 in chapter 1". FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
WARNING Improper installation or attachment of equipment or accessories could result in electrical shock, short-circuit, leaks, fire or other damage to the equipment. ONLY use accessories, optional equipment and spare parts made or approved by Daikin unless otherwise specified. WARNING Make sure installation, testing and applied materials comply with applicable legislation (on top of the instructions described in the Daikin documentation).
WARNING Make sure installation, servicing, maintenance and repair comply with instructions from Daikin and with applicable legislation and are executed ONLY by authorised persons. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 –...
Page 9
Keep the pipework installation to a minimum. To determine the minimum floor area 1 Determine the total refrigerant charge in the system (= factory refrigerant charge additional refrigerant amount charged). FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Page 10
9.55 m Total refrigerant charge in the system Minimum floor area (a) Ceiling-mounted unit (= Ceiling-mounted unit) (b) Wall-mounted unit (= Wall-mounted unit) (c) Floor-standing unit (= Floor-standing unit) FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Make sure refrigerant piping installation complies with applicable legislation. In Europe, EN378 is the applicable standard. NOTICE Make sure the field piping and connections are NOT subjected to stress. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
For the location of the terminals, see the wiring diagram. ▪ Do NOT touch electrical components with wet hands. ▪ Do NOT leave the unit unattended when the service cover is removed. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Page 13
MUST be as such that the current-carrying wires are tautened before the earth wire is in case the power supply is pulled loose from the stress relief. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Page 14
ON and OFF while the product is operating, attach a reversed phase protection circuit locally. Running the product in reversed phase can break the compressor and other parts. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
▪ Make electrical connections to the fixed wiring. ▪ All components procured on-site and all electrical construction MUST comply with the applicable legislation. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Page 16
Do NOT disassemble, modify or repair the adapter. ▪ Grip the connector when disconnecting the connecting cord. ▪ Turn OFF the power supply in case the adapter gets damaged. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Titanium apatite deodorising filter and the silver particle filter (Ag-ion filter) e Indoor unit fixing screw (M4×12L). Refer to "9.3 To fix the unit on the mounting plate" [ 42]. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Page 18
About the box f Dry battery AAA.LR03 (alkaline) for user interface g User interface holder h User interface i Mounting plate j Wireless LAN adapter FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Condensation and water dripping might occur if the unit runs outside its operation range. 5.3 About the wireless LAN ▪ Wireless LAN adapter is part of the accessory bag. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
INFORMATION: Declaration of conformity ▪ Daikin Industries Czech Republic s.r.o. declares that the radio equipment type inside of this unit is in compliance with Directive 2014/53/EU and S.I. 2017/1206: Radio Equipment Regulations 2017. ▪...
Wall insulation. When conditions in the wall exceed 30°C and a relative humidity of 80%, or when fresh air is inducted into the wall, then additional insulation is required (minimum 10 mm thickness, polyethylene foam). FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
≥50 ≥50 (mm) 6.2 Opening the unit 6.2.1 To remove the front panel 1 Hold the front panel by the panel tabs on both sides and open it. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
1 Remove the front panel to remove the air filter. 2 Remove 2 screws from the front grille. 3 Push down the 3 upper hooks marked with a symbol with 3 circles. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
4 Finish the installation by securing the mounting plate on the wall using M4×25L screws (field supply). INFORMATION The removed pipe port cover can be kept in the mounting plate pocket. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
To connect the piping on right-side, right-bottom, left-side or left-bottom, the pipe port cover MUST be removed. 1 Cut off the pipe port cover from inside the front grille using a coping saw. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
NOTICE ▪ Install the drain hose with a downward slope. ▪ Traps are NOT permitted. ▪ Do NOT put the end of the hose in water. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
1 Attach the drain hose with adhesive vinyl tape to the bottom of the refrigerant pipes. 2 Wrap the drain hose and the refrigerant pipes together using insulation tape. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Insulation fixing screw b Drain hose 4 Attach the drain hose to the refrigerant piping bottom side using adhesive vinyl tape. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Remove the pipe port cover here for left-bottom piping 6.4.4 To check for water leaks 1 Remove the air filters. 2 Gradually pour approximately 1 l of water in the drain pan, and check for water leaks. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Annealed (O) Depending on the applicable legislation and the maximum working pressure of the unit (see "PS High" on the unit name plate), larger piping thickness might be required. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
7.2.2 Precautions when connecting the refrigerant piping INFORMATION Also read the precautions and requirements in the following chapters: ▪ "2 General safety precautions" [ 7] ▪ "7.1 Preparing refrigerant piping" [ 30] DANGER: RISK OF BURNING/SCALDING FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Take the following guidelines into account when connecting pipes: ▪ Coat the flare inner surface with ether oil or ester oil when connecting a flare nut. Tighten 3 or 4 turns by hand, before tightening firmly. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
3 Remove the flare nut from the stop valve and put the flare nut on the pipe. 4 Flare the pipe. Set exactly at the position as shown in the following figure. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
7.2.7 To check refrigerant piping joints for leaks after charging refrigerant 1 Perform the leak tests according to instructions in the outdoor unit installation manual. 2 Charge refrigerant. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Page 35
Test leaks using a pressure of at least 0.25 times the maximum working pressure (see "PS High" on the unit nameplate). If a leak is detected 1 Recover the refrigerant, repair the joint, and repeat the test. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
ALWAYS use multicore cable for power supply cables. INFORMATION Also read the precautions and requirements in the "2 General safety precautions" [ 7]. INFORMATION Also read "8.1.3 Specifications of standard wiring components" [ 39]. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
To prepare stranded conductor wire for installation Method 1: Twisting conductor 1 Strip insulation (20 mm) from the wires. 2 Slightly twist the end of the conductor to create a "solid-like" connection. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Page 38
Terminal b Screw c Flat washer Allowed NOT allowed ▪ The earth wire between the wire retainer and the terminal must be longer than the other wires. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Note: In case the interconnection cable was stripped in advance, cover the ends with insulating tape. 4 Bend the end of the cable up. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Page 40
9 Pull the wires to make sure that they are securely attached, then retain the wires with the wire retainer. 10 Shape the wires so that the service cover fits securely, then close the service cover. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
1 Shape the refrigerant pipes along the pipe path marking on the mounting plate. a Drain hose b Caulk this hole with putty or caulking material c Adhesive vinyl tape d Insulation tape e Mounting plate (accessory) FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
3 Install the air filter and then mount the front panel. 9.4.2 To close the service cover 1 Place the service cover to its original place on the unit. 2 Install 1 screw back on the service cover. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
1 Attach the front panel. Align the shafts with the slots and push them all the way in. 2 Close the front panel slowly; press at both sides and at the centre. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
3 Remove the upper case of the wireless LAN adapter. a Upper case b Printed circuit board of the wireless LAN adapter c Lower case 4 Attach the connecting cord connector (white). FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
7 Fix the upper adapter case with 2 screws (accessory). 2× 10.1.2 To place the adapter into the unit 1 Place the wireless LAN adapter against the hooks. 2 Lock the adapter by pressing it down. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
2 Follow the directions on the screen to install the ONECTA app. INFORMATION Scan the QR code to download and install the ONECTA app on your mobile phone or tablet: FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Jumper Address Factory set default After cutting jumper INFORMATION If the setting could NOT be completed while the operation lamp was blinking, repeat the setting process from the beginning. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Page 48
Result: The user interface will return to the previous screen. INFORMATION In case you could NOT complete the setting in time, turn the power supply off and wait at least 1 minute before turning the power supply back on. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
12 Commissioning NOTICE General commissioning checklist. Next to the commissioning instructions in this chapter, a general commissioning checklist is also available on the Daikin Business Portal (authentication required). The general commissioning checklist is complementary to the instructions in this chapter and can be used as a guideline and reporting template during commissioning and hand-over to the user.
Some of the functions CANNOT be used in the test run operation mode. If a power failure occurs during operation, the system automatically restarts immediately after power is restored. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
▪ Show the user what to do for the maintenance of the unit. ▪ Explain about energy saving tips to the user as described in the operation manual. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Do NOT try to dismantle the system yourself: dismantling of the system, treatment of the refrigerant, oil and other parts MUST comply with applicable legislation. Units MUST be treated at a specialised treatment facility for reuse, recycling and recovery. FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Technical data 15 Technical data ▪ A subset of the latest technical data is available on the regional Daikin website (publicly accessible). ▪ The full set of latest technical data is available on the Daikin Business Portal (authentication required). 15.1 Wiring diagram The wiring diagram is delivered with the unit, located on the inner right side of the indoor unit front grille.
Page 54
N=* Number of passes through ferrite core Pulse-amplitude modulation PCB* Printed circuit board Power module Switching power supply PTC* PTC thermistor Insulated gate bipolar transistor (IGBT) Circuit breaker FTXTP-M_FTXTP-N Installer reference guide Daikin room air conditioner 4P728168-4 – 2023.03...
Optional equipment Equipment made or approved by Daikin that can be combined with the product according to the instructions in the accompanying documentation. Field supply Equipment NOT made by Daikin that can be combined with the product according to the instructions in the accompanying documentation.
Page 60
DAIKIN ISITMA VE SOĞUTMA SİSTEMLERİ SAN.TİC. A.Ş. Gülsuyu Mahallesi, Fevzi Çakmak Caddesi, Burçak Sokak, No:20, 34848 Maltepe İSTANBUL / TÜRKİYE Tel: 0216 453 27 00 Faks: 0216 671 06 00 Çağrı Merkezi: 444 999 0 Web: www.daikin.com.tr 4P728168-4 2023.03 Verantwortung für Energie und Umwelt...