Waterous AQUIS ULTRAFLOW Installation And Operation Manual page 41

Table of Contents

Advertisement

Safety
Introduction
Plumbing Layout
Description
Description
1
Concentrate supply line—this transports concentrate around the system.
2
Concentrate supply refill line—this allows you to fill the on-board tank from an auxiliary source.
3
Priming line—this evacuates air from the concentrate pump inlet as the system primes before operation.
4
Priming bypass line—this prevents contaminating the concentrate during testing and training. When water is substituted for concentrate during training or
testing, and you have concentrate in the supply tank, this bypass valve diverts water from the supply tank to prevent concentrate contamination. It is also
very important to make sure that you drain any remaining water in the line before priming the system with concentrate.
5
Auxiliary concentrate supply line—this allows you to source concentrate from an external source.
6
Low-flow bypass line—this returns a portion of the pumped concentrate in the supply line back to the pump inlet when the desired concentrate output
requires the pump to operate at an RPM that is lower than possible by the pump.
7
Transfer line—this line allows you to transfer or relay concentrate to another location.
8
Discharge line assembly—this manages the concentrate injected into the solution-capable discharge.
9
Solution-capable discharge—this transports clear water and is capable of creating a foam solution.
Product Overview
|
41
62
Installation
Operation

Advertisement

Table of Contents
loading

Table of Contents