Maintenance; Maintenance Plan; Technical Service - Binder redLINE RE 53 Operating Manual

Table of Contents

Advertisement

10.

Maintenance

Electrical hazard.
Danger of death.
∅ redLINE chambers must NOT become wet during operation or maintenance work.
∅ Do NOT remove the rear panel of the unit.
Disconnect the chamber before conducting maintenance work. Disconnect the power
plug.
Ensure all maintenance work is conducted by licensed electricians or experts
authorized by the manufacturer.

10.1 Maintenance plan

Weekly
• Dust the housing.
• Check the power cable for damage
Following use
• Clean and, if necessary, disinfect the chamber (chap. 8)
• Check the chamber for mechanical damage and corrosion
• Check the door gaskets for proper fit and mechanical damage
Annually
• Check the temperature controller and, if necessary, adjust it (chap. 7)
Replace the door gasket only when cold. Otherwise, the door gasket may become damaged.
11.

Technical service

Web resources
Visit the website www.binder-redline.com for:
• Complete technical service contact information
• Access to the online catalogue, and information about accessories and related products.
• Additional product information and special offers
Contact us
For information or technical assistance contact your local distributor or visit www.binder-redline.com.
Redline Operating Manual RE / RF / RI 12/2010
DANGER
page 39/46

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents