Installation Of The Equipment; Electrical Connection - Binder redLINE RE 53 Operating Manual

Table of Contents

Advertisement

• Place the first chamber at the intended location. Leave
enough space between the rear panel of the chamber
and the wall behind it, so that you can turn screws into
the rear panel using a TX20 screwdriver.
• Unscrew two of the screws which fix the upper edge of
the rear panel of the lower chamber.
• Fasten two flat assembly bars with these screws at the
upper edge of the rear panel.
• Place the second chamber on top of the first.
• Unscrew two of the screws which fix the lower edge of
the rear panel of the upper chamber.
• Place the upper chamber in a way that the empty
drilling holes overlap the holes in the lower chamber's
flat assembly bar.
• Screw the two assembly bars to the rear panel of the
upper chamber.
4.

Installation of the equipment

4.1

Electrical connection

• Power supply voltage 230 V (1N~) +/- 10 %, 50/60 Hz. UL-units: 100-120 V (1N~) +/- 10 %, 50/60 Hz
• Power connection: IEC connector plug and cable of 2500 mm / 98.4 in in length
• Plug 230 V units: shockproof plug. Plug UL-units: NEMA 5-15P
• Prior to connection and start-up, check the power supply voltage. Compare the values to the specified
data located on the unit's type plate (on the left-hand side of the unit, see chap. 1.4).
• When connecting, please observe the regulations specified by the local electricity supply company
and as well as the VDE directives (for Germany)
• Pollution degree (acc. to IEC 1010-1): 2
• Over-voltage category (acc. to IEC 1010-1): II
Danger of incorrect power supply voltage.
Damage to the equipment.
Check the power supply voltage before connection and start-up.
Compare the power supply voltage with the data indicated on the type plate.
See also electrical data (chap. 14.4).
Redline Operating Manual RE / RF / RI 12/2010
Figure 7: Stacking two redLINE chambers
CAUTION
page 22/46

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents