5.

Start up

Warming chambers may release odors in the first few days after commissioning. This is not a quality
defect. To reduce odors quickly we recommend heating up the chamber to its nominal temperature for
one day and in a well ventilated location.
5.1

Adjusting the air change

The air flap on top on the inner back wall serves to adjust the air change.
Without connecting a suction plant:
• RI and RE: Fresh air circulation can be elevated using the outgoing air pipe. The air flap in the
outgoing air pipe serves to adjust the fresh air entry.
• RF: With the air flap open and the fan operating, fresh air comes in via aeration gaps.
If the air flap is completely open, the spatial temperature accuracy may be negatively
influenced.
Adjust the air flap in a way that no condensation occurs inside the unit.
Redline Operating Manual RE / RF / RI 12/2010
Figure 8: Adjusting the air change RF
Figure 9: Adjusting the air change RE and RI
= air flap open
= air flap closed
page 24/46